Under an annual device replacement rate of 15 percent, the replacement costs decrease by 21 percent over the 15-year period of the analysis, and the total costs decrease to $80.8 million...
Search Results "Maintenance Cost"
Commonly Searched Documents
- 
    
  
  4.2.5. Device Replacement
  
- 
    
  
  Maintenance
  Maintenance does not change the original purpose, intent, or design of a trail.... 
- 
    
  
  5. ADJUSTED CONSTRUCTION COST
  ADJUSTED CONSTRUCTION COST... 
- 
    
  
  General: ADA Standard Section 407.1
  Section 407.1 of the ADA Standards covers information in the current ADA Standards for elevators. 
- 
    
  
  101.4.4 Property maintenance
  The provisions of the California Existing Building Code shall apply to existing structures and premises; equipment and facilities; light, ventilation, space heating, sanitation, life... 
- 
    
  
  ADJUSTED CONSTRUCTION COST
  [DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and... 
- 
    
  
  ADJUSTED CONSTRUCTION COST
  [DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and... 
- 
    
  
  Maintenance of Accessible Features
  The ADA Standards address the design, but not the maintenance, of building elements and features.... 
- 
    
  
  Summary of Costs and Benefits
  We determined the final rule would not result in additional costs for camping facilities and picnic facilities.... 
- 
    
  
  4. Maintenance Policies
  Maintenance Policies 149.... 
- 
    
  
  What can be done to improve accessibility during routine facility maintenance?
  Maintenance and routine service present many opportunities to improve accessibility.... 
- 
    
  
  Cost Estimates for Barrier Removal
  Basic Costs $0.00 Cost Estimate is expected to be zero. $1.00 Unit Cost Estimate is too dependent on existing conditions to set a generic estimate.... 
- 
    
  
  1.1 Maintenance and Repair Projects
  1.1 Maintenance and Repair Projects: Projects limited to maintenance or repair are not alterations and do not trigger accessibility requirements.... 
- 
    
  
  Maintenance of Accessible Features
  If an accessible feature such as a wheelchair lift breaks down the public entity must ensure that improper or inadequate maintenance does not cause repeated failures.... 
- 
    
  
  MAINTENANCE OF ACCESSIBLE FEATURES {35.133}
  MAINTENANCE OF ACCESSIBLE FEATURES {35.133} Features of facilities and equipment required to be “readily accessible to and usable by” must be maintained in operable working order Isolated... 
- 
    
  
  Checklist for Facility MAINTENANCE Responsibilities
  ◼ Checklist for Facility MAINTENANCE Responsibilities (11/16/00) Click here to view or download the "Checklist for Facility MAINTENANCE Responsibilities" (20 KB pdf)... 
- Trail Construction and Maintenance Notebook - 2007 Edition
- 
    
  
  § 36.211 Maintenance of accessible features.
  § 36.211 Maintenance of accessible features. * * * * *... 
- 
    
  
  § 35.133 Maintenance of accessible features
  § 35.133 Maintenance of accessible features. *****... 
- 
    
  
  §35.133 Maintenance of accessible features
  §35.133 Maintenance of accessible features.... 
- 
    
  
  II-3.10000 Maintenance of accessible features
  II−3.10000 Maintenance of accessible features.... 
- 
    
  
  Engineered Wood Fiber
  The EWF ranged in cost from $ .74/sq. ft. to $2.50/sq. ft. ... 
- 
    
  
  Other Cost Issues
  Other Cost Issues An employer may not claim undue hardship simply because the cost of an accommodation is high in relation to an employee's wage or salary.... 
- 
    
  
  Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis)
  Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis) In the NPRM, the Department requested comment on various cost... 
