In residential facilities containing residential dwelling units required to provide mobility features complying with 809.2 through 809.4, parking spaces provided in accordance with F208.2.3.1...
Search Results "Monitoring Space"
-
F208.3.2 Residential Facilities
-
208.3.2 Residential Facilities
In residential facilities containing residential dwelling units required to provide mobility features complying with 809.2 through 809.4, parking spaces provided in accordance with 208.2.3.1...
-
208.3.2 Residential Facilities
In residential facilities containing residential dwelling units required to provide mobility features complying with 809.2 through 809.4, parking spaces provided in accordance with 208.2.3.1...
-
R308.2 Transit Shelters
Transit shelters shall provide a minimum clear space complying with R404 entirely within the shelter....
-
4.34.6.7* OVENS
Ovens shall be of the self-cleaning type or be located adjacent to an adjustable height counter with knee space below (see Fig. 52)....
-
Pay Stations
Pay stations and other elements that serve accessible parking spaces must comply with requirements for operable parts (§309) and be served by an accessible route....
-
§ 38.57(b)
at least 32 inches wide so that at least two wheelchair or mobility aid users can enter the vehicle and position the wheelchairs or mobility aids in areas, each having a minimum clear space...
-
11B-704.2.1.2 Forward approach
Where a forward approach is provided at a telephone within an enclosure, the counter may extend beyond the face of the telephone 20 inches (508 mm) into the required clear floor or ground space...
-
382.123 What are the requirements concerning priority cabin stowage for wheelchairs and other assistive devices?
This section is related to the requirements for priority stowage spaces in section 382.67 and an opportunity to preboard in section 382.93....
-
1016.9 Protruding Objects
Constructed elements on outdoor recreation access routes, passing spaces, and resting intervals shall comply with 307. Advisory 1016.9 Protruding Objects. ...
-
Accessible Route
A continuous unobstructed path connecting all accessible elements and spaces of a building or facility....
-
11B-502.8.2 Lettering
The additional sign shall clearly state in letters with a minimum height of 1 inch (25 mm) the following: "Unauthorized vehicles parked in designated accessible spaces not displaying...
-
Site Constraints
This is intended to cover altered facilities where limited space or other constraints preclude construction of a complying ramp....
-
1016.9 Protruding Objects
Constructed elements on outdoor recreation access routes, passing spaces, and resting intervals shall comply with 307. Advisory 1016.9 Protruding Objects....
-
11B-502.8.2 Lettering
The additional sign shall clearly state in letters with a minimum height of 1 inch (25 mm) the following: "Unauthorized vehicles parked in designated accessible spaces not displaying...
-
11B-502.8.2 Lettering
The additional sign shall clearly state in letters with a minimum height of 1 inch (25 mm) the following: "Unauthorized vehicles parked in designated accessible spaces not displaying...
- Magnuson Group SLOPE Waste Receptacles
- Seton Florida State Parking Signs - ISA Symbol
- Delta Single Handle Centerset Lavatory Faucet 515LF-HDF
-
11B-219.5 Permanent and portable systems
The California Building Code (CBC) requires permanently installed assistive listening systems in those assembly areas where audible communication is integral to the use of a space (movie...
-
11B-219.5 Permanent and portable systems
The California Building Code (CBC) requires permanently installed assistive listening systems in those assembly areas where audible communication is integral to the use of a space (movie...
-
2. New Construction and Alterations
that an architect's professional standard of care is to deliver a building that "generally conforms" to access requirements, and that is the standard he used as court appointed expert monitoring...
-
Bonded Beach Path Installation
Because the installation occurred in the fall, we monitored air temperature; both stabilizing binders required 4°C (40°F) for proper curing....
-
Background
Monitoring of the Phase II test plot continued for 2 years after the initial 6-month evaluation reported by Laufenberg and Winandy (2003)....