The Acoustiguide Mobile cloud-hosted content management system allows one to independently author content, giving them complete control over its delivery....
Search Results "Volume Control Symbol"
Commonly Searched Documents
- Acoustiguide Custom Multimedia Content Application
- citEcar Wheelchair 6PR SL Street Legal Golf Cart
- June Kailes
-
How to Use the 2010 ADA Standards PDF Pocket Guide
Learn how to use the 2010 ADA Standards PDF Pocket Guide
-
1.1.3.2 State-regulated buildings, structures, and applications
Barbering, cosmetology or electrolysis establishments, acupuncture offices, pharmacies, veterinary facilities, and structural pest control locations regulated by the Department of Consumer...
-
Section 2: References
Centers for Disease Control and Prevention. Environmental barriers to health care among persons with disabilities, Los Angeles county, California, 2002-2003....
-
4.1 Wheeled Mobility Device Dimensions
device sizes is available from manufacturers, it does not include actual dimensions as set up for individuals nor does it provide data on added equipment like seating systems, cushions, control...
-
Designed and Constructed for First Occupancy (Preamble, Section-by-Section Analysis)
In this case, it is the date of the later application that would control, unless construction is not completed within the time allowed by the permit, in which case a third permit would be...
-
Triggering event
Some commenters expressed concern that using the date of “ start of construction’’ was problematic because the date can be affected by factors that are outside the control of the owner....
-
Section 36.404 Alterations: Elevator Exemption (Preamble, Section-by-Section Analysis)
rental establishments, or (2) a series of buildings on a common site, connected by a common pedestrian access route above or below the ground floor, either under common ownership or common control...
-
§ 382.40 Boarding assistance for small aircraft
boarding assistance is not required to be provided under paragraph (c)(4) of this section, or cannot be provided as required by paragraphs (b) and (c) of this section for reasons beyond the control...
-
2. Equipment Clearances for Breast Platforms
2004 ADA and ABA Accessibility Guidelines and typically will allow a person seated in a wheelchair to pull underneath a work surface or equipment component or permit forward access to a control...
-
4.2 Stretchers
Another component is the 6" high lift clearance window that forces foot operated controls up....
-
Trail Study Sites
The amount of waterline fluctuation was considered minimal at this beach because of the proximity of water control structures....
-
John Brabyn, Ph.D., Director of Rehabilitation Engineering Research, Center on Low Vision and Blindness (NIDRR), Smith-Kettlewell Eye Research Institute
Provide means of controlling natural and artificial light. Aim for uniformity of illumination, avoiding strong shadows....
-
Guidelines for Requirement 7
The Department has eliminated the specification that controls for ranges and cooktops be placed so that reaching across burners is not required....
-
Best Practices
Rights Law; learning about issues affecting people with disabilities; providing information to the public on programs and services; ensuring that construction projects within the agency’s control...
-
Triggering event. (Section-by-Section Analysis)
Some commenters expressed concern that using the date of " start of construction'' was problematic because the date can be affected by factors that are outside the control of the owner....
-
Table 3
DOJ 2010 Standards.26 The requirements in the proposed guidelines in Table 3 are compared to other applicable accessibility standards and the 2009 edition of Manual on Uniform Traffic Control...
-
Emergency Evacuation Devices
These chairs are designed to travel down stairs on special tracks with friction braking systems, rollers or other devices to control the speed of descent....
-
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments)
In this case, it is the date of the later application that would control, unless construction is not completed within the time allowed by the permit, in which case a third permit would be...
-
Category 2 Eligibility
However, if temporary conditions not under the operator's control (e.g., construction, an accident, a landslide) make it so hazardous for anyone to disembark that the stop is temporarily...
-
ASME
Each of the lift types addressed in ASME A18.1 must meet requirements for capacity, load, speed, travel, operating devices, and control equipment....
-
The Government Response
Kemp thought the bill needed to be more detailed to avoid control by bureaucratic regulators....