(Approved by the Office of Management and Budget under control number 2529-0046) [64 FR 16330, Apr. 2, 1999]...
Search Results "Project Management"
Commonly Searched Documents
-
§100.306 Intent to operate as housing designed for persons who are 55 years of age or older.
-
§100.307 Verification of occupancy.
(Approved by the Office of Management and Budget under control number 2529-0046) [64 FR 16330, Apr. 2, 1999]...
-
New Customers
Using this guidance, a small business owner or manager can ensure that it will not unintentionally exclude people with disabilities and will know when it needs to remove barriers in its...
-
11B-812.10.4 Location
EV chargers shall be adjacent to, and within the projected width of, the vehicle space being served. Exceptions: 1....
-
1.2.1
A California-registered structural engineer shall examine the project and prepare a written statement certifying that the project does not contain any work of a structural nature....
-
14.2 Q. If both open and covered parking spaces are provided, how many of each type must be accessible?
., surface parking or garage, that are provided for other residents of the project....
-
6.2 Additional Accessible Elements
6.2 Additional Accessible Elements: The obligation to upgrade the additional accessible elements in Item 6 applies only to those elements within the primary path of travel serving the project-specific...
-
Debra E. Babcock, PMP: Information Center for Accessibility Needs (iCAN) at IRS
Focus Groups being conducted at IRS Facilities Managers find it time consuming and often confusing to find the right reasonable accommodation process and other disability-related help...
-
12111(2) Covered entity
--The term covered entity means an employer, employment agency, labor organization, or joint labor-management committee....
-
12111(2) Covered entity
(2) Covered entity The term "covered entity" means an employer, employment agency, labor organization, or joint labor-management committee....
-
DEFINITIONS
“Content Management System” or “CMS” means the components of the edX software platform with which Course Creators interact, including, without limitation, the HTML editor, video upload screens...
-
Trail Class
Trail Class—The prescribed scale of development for a trail, representing its intended design and management standards. (See the Federal Trail Data Standards.)...
-
Recreation Site
Recreation Site—A discrete area on a national forest that provides recreation opportunities, receives use, and requires a management investment to operate and/or maintain to standard....
-
6.2 Presentations that Informed the Minimum Height Deliberations
As noted in Section 3.3.1, Edward Steinfeld, ArchD, attended the second Advisory Committee meeting and presented results from the Anthropometry of Wheeled Mobility Project, conducted at...
-
Appendix C: Resources
Project UNIFY www.specialolympics.org/projectunify.aspx The Special Olympics' Project UNIFY is supported by the Office of Special Education Programs (OSEP)....
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
6. ALTERNATIVES
ALTERNATIVES The Office of Management and Budget (OMB) states that regulatory analyses should consider alternatives to the rule or regulation being evaluated.33 Thus, the Department...
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
11B-202 Existing buildings and facilities
of this code as those requirements or regulations now exist or are hereafter amended consisting of one or more of the following items shall be limited to the actual scope of work of the project...