Exceptions: A manual fire alarm system is not required in buildings not over two stories in height where all individual guestrooms and contiguous attic and crawl spaces are separated...
Search Results "Elevator Building"
-
907.2.8 Group R-1
-
Location [4.6.2] and Dispersion
For example, spaces for an out-lying lot can be placed in a lot closer to the building served since accessible spaces must be located on the shortest accessible route to an accessible facility...
-
Location and Signage
Location and Signage ADAAG does not specify where text telephones are to be located on a site or in a building (except in hospitals, airports, and transit stations)....
-
What access do I need?
Access Checklist ◼ I need a bus stop or parking space close to the building. ◼ I need a path with ramps from the parking or bus to the building....
-
1.1.8.1 Findings and filings
Exception: Hazardous building ordinances and programs mitigating unreinforced masonry buildings. 2....
-
1.1.8.1 Findings and filings.
Exception: Hazardous building ordinances and programs mitigating unreinforced masonry buildings. 2....
-
For People with Disabilities, Which Circulation Paths Are Usable, Available, and Closest?
These plans should be given to visitors who are blind or have low vision when they enter the building so they can find the exits in an emergency....
-
SHOPPING CENTER (OR SHOPPING MALL)
For the purposes of this section, “shopping center” or “shopping mall” includes a covered mall building. Advisory Definition of SHOPPING CENTER (or SHOPPING MALL). ...
-
7. Path of Travel Requirements and Adjusted Construction Cost
alterations incidental to the primary scope of installing a PV system are included as part of the project, the adjusted construction cost for purposes of complying with the 2013 California Building...
-
The Commenters
These commenters included: the Southern Building Code Congress International (SBCCI); the U.S....
-
Appendix 4 – References
Adelaide South Australia, Public Buildings Department. Bails, J.H. (1983). ...
-
PUBLIC USE
Public use may be provided at a building or facility that is privately or publicly owned....
-
PUBLIC USE
Public use may be provided at a building or facility that is privately or publicly owned....
-
11B-809.10.6.3 Clearance
ETA Editor's Note: From DSA's "Summary of New and Amended 2025 California Building Code (CBC) Regulations for Accessibility in the Triennial Code Cycle": "Amendments increase clear floor...
-
Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
Sec. 469.054(c)(3)
(3) the processing of an application for a variance from accessibility standards for a building or facility....
-
106.5.3 Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
3.2 Dimensional Tolerances
All dimensions are subject to conventional building industry tolerances for field conditions....
-
Construction (Trail Terminology)
Construction is building a new trail or segment of trail where there was no trail before....
-
4.1.6(1) General
Alterations to existing buildings and facilities shall comply with the following:...
-
3.2 DIMENSIONAL TOLERANCES
All dimensions are subject to conventional building industry tolerances for field conditions....
-
ELEMENT
[DSA-AC] An architectural or mechanical component of a building, facility, space or site....
-
OCCUPANT LOAD
The number of persons for which the means of egress of a building or portion thereof is designed....
-
ELEMENT
[DSA-AC] An architectural or mechanical component of a building, facility, space or site....