When telephone calls are received from a deaf person using a TTY or relay service, the call should be answered promptly and appropriately....
Search Results "Assurances from Contractors"
Commonly Searched Documents
-
Communication
-
5.2.2.2 Transfer Surface Depth Recommendation for M302
Members proposed increasing the minimum depth of the transfer surface from 15 inches to 17 inches....
-
Sinks [F212.3, Exception 2]
When hot water is provided, the drainpipes at sinks and lavatories must be wrapped, insulated, or shielded to help prevent a person using a mobility device from accidentally touching the...
-
206.4.4.2 Direct Connections
Direct connections to other facilities shall provide an accessible route complying with 404 from the point of connection to boarding platforms and all transportation system elements required...
-
602.2 Clear Floor Space
approach complying with 305 shall be permitted at units for children's use where the spout is 30 inches (760 mm) maximum above the finish floor or ground and is 3 1/2 inches (90 mm) maximum from...
-
R406 Reach Ranges (Section-by-Section Analysis)
The requirements for reach ranges differ from the 2004 ADA and ABA Accessibility Guidelines in that forward reach over an obstruction is not permitted, and side reach over an obstruction...
-
Guidance on permissible service animals.
Therefore, the Department is proposing to eliminate certain species from coverage even if the other elements of the definition are satisfied....
-
PROGRAM ACCESSIBILITY {Subpart D}
existing facilities), no qualified individual with a disability shall, because a public entity’s facilities are inaccessible to or unusable by individuals with disabilities, be excluded from...
-
17. Grievance and Complaint System
Grievance and Complaint System Within six (6) months after the commencement of the Compliance Period, and with input from Class Counsel, the City shall establish a policy and procedure...
-
DOT Disability Hotline or Hotline:
Members of the public may call 1-800-778-4838 (voice) or 1-800-455-9880 (TTY) from 7 a.m. to 11 p.m....
-
E2-a
Are pedestrian routes leading to or serving each service or activity area of the shelter free of objects that protrude from the side more than 4 inches into the route with the bottom of...
-
No Advance Seat Assignments
[Sec. 382.38(d)] If a carrier wishes to comply with this requirement in another way, it must receive written approval from DOT. [Sec. 382.38(e)]...
-
11B-502.6.4.1
The centerline of the International Symbol of Accessibility shall be a maximum of 6 inches (152 mm) from the centerline of the parking space, its sides parallel to the length of the parking...
-
12181(2) Commercial facilities
railroad cabooses, railroad cars described in section 12162 of this title or covered under this subchapter, railroad rights-of-way, or facilities that are covered or expressly exempted from...
-
407.3.3 Numeric Keys (Section-by-Section Analysis)
The requirement for a tactilely discernible “5” key derives from existing 508 Standards § 1194.23(k)(1), but would be a new requirement for the 508 Standards and 255 Guidelines....
-
A4.26.1 General
The grab bar clearance of 1‒1/2 in (38 mm) required in this guideline is a safety clearance to prevent injuries resulting from arms slipping through the openings....
-
4.3.11.1(7)
Pressurization equipment and its duct work within the building shall be separated from other portions of the building by a minimum two-hour fire-resistive construction....
-
C201.1 Scope
Manufacturers of telecommunications equipment shall comply with the requirements in the 255 Guidelines applicable to such equipment when newly released, upgraded, or substantially changed from...
-
5.1 Tell the Doctor and the Staff
Or you could say, “There isn’t a curb cut onto the sidewalk from the accessible parking and I had to roll in the street for a block.”...
-
407.12 Reach Height
This provision allows operable parts of ICT to be designed to be reached by a person seated in a wheelchair from a forward or side position, depending upon the design....
-
Stress Management
Situations that create stress can vary from person to person, but could likely involve heavy workloads, unrealistic timeframes, shortened deadlines, or conflict among coworkers....
-
2 Method
The two main dependent measures were: Whether the detectable warnings could be seen from distances between 2.44 m (8ft) and 7.92 m (26 ft)....
-
4.1.2(5)
EXCEPTION: Elevator pits, elevator penthouses, mechanical rooms, piping or equipment catwalks are excepted from this requirement....
-
A4.26.1 GENERAL
The maximum grab bar clearance of 1-1/2 in (38 mm) required in this standard is a safety clearance to prevent injuries from arms slipping through the opening....