Swinging door and gate surfaces within 10 inches (255 mm) of the finish floor or ground measured vertically shall have a smooth surface on the push side extending the full width of the door...
Search Results "Latch Side Clearance"
Commonly Searched Documents
-
404.2.10 Door and Gate Surfaces
-
505.6 Gripping Surface
Handrail gripping surfaces shall be continuous along their length and shall not be obstructed along their tops or sides....
-
11B-405.5 Clear width
Handrails may project into the required clear width of the ramp at each side 3½ inches (89 mm) maximum at the handrail height. 3. ...
-
11B-505.6 Gripping surface
Handrail gripping surfaces shall be continuous along their length and shall not be obstructed along their tops or sides....
-
501.1 Scope
Applications may be web-based or client-side software....
-
Common Requirements (R304.5) (Section-by-Section Analysis)
Common Requirements (R304.5) (Section-by-Section Analysis) The clear width of curb ramp runs (excluding flared sides), blended transitions, and turning spaces must be 1.2 meters (4 feet...
-
FAQ: Why should I enter ADA references in the content I add to my Corada WorkSpace?
When the reference options are displayed, click on "308.3 Side Reach." Repeat this process until all applicable/desired references are entered. ...
-
2.7 Comparing Visual Detection Rates and High Conspicuity Ratings for Detectable Warnings
Note that when detectable warning color was similar to the side walk color, the number of people who would be served by the visual properties of the detectable warning decreased markedly...
-
Accessible Pathway & Corridor: Minimum Clear Width Required for 90-degree Turn
The other side of each leg had moveable walls. The enclosed space was incrementally increased until a user could pass through the turn successfully....
-
1.1.14 Flatness of ramp cross slope
As the ramp gets wider, users may tend to travel toward one side or the other, especially if the ramp is not a curb ramp and has handrails....
-
Hours and Days of Service
For example, if a provider uses its own paratransit vans during high demand periods, it could use a private contractor or user-side subsidy provider during low demand periods....
-
ETA Public Telephone Summary Chart and Survey Instructions
If, in an exterior location, and dial tone first service is available, then a side reach telephone may be installed instead of the required forward reach telephone. [4.1.3(17)(a)3] g....
- FBD Partnership Two Flavors Frozen Beverage Dispenser
- FBD Partnership Three Flavors Frozen Beverage Dispenser
- BEA Inc. PBDGP Series Vestibule Push Plate (Push to Open)
- Sargent 421 Cam Action Door Closer
- Stanley QCI 200 Series Grade 2 Standard-Duty Interconnected Locks
- Yale 51 Series Industrial Door Closer
- Norton Surface Mounted 7900 Series Overhead Door Closer
- DORMA C800 Series Lockset
- Stanley QCL 200 Series Grade 2 Standard Duty Cylindrical Locks
- TownSteel ED6500 Narrow Stile Panic Rim Device
-
11B-410.8 Restriction sign
. ◼ ETA Editor's Note There are no requirements for landing size or restriction signs in 2010 ADAS, although the door maneuvering clearance requirements at 404.2.4 should be...
-
R402 Protruding Objects (Section-by-Section Analysis)
Guardrails or other barriers to pedestrian travel must be provided where the vertical clearance on pedestrian circulation paths is less than 2 meters (6.7 feet) high....