The device shall be activated by sensing an obstruction passing through the opening at 5 inches (127 mm) nominal and 29 inches (737 mm) nominal above the finish floor.
Search Results "High Energy Door"
Commonly Searched Documents
-
11B-407.3.3.1 Height
-
Maneuvering Space at Doors
Several commenters requested that the final Guidelines incorporate minimum maneuvering clearances at doors, as provided by the ANSI Standard....
-
Opening Force [§404.2.9]
to fully open a door, not the initial force needed to overcome the door’s seal resulting from unequal pressure....
-
1132A.3 Width and height of interior doors and secondary exterior doors
Doors shall comply with the following:...
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
404.2 Manual Doors, Doorways, and Manual Gates
Manual doors and doorways and manual gates intended for user passage shall comply with 404.2....
-
404.2 Manual Doors, Doorways, and Manual Gates
Manual doors and doorways and manual gates intended for user passage shall comply with 404.2....
-
Maneuvering Clearances at Doors [4.13.6]
Maneuvering Clearances at Doors [4.13.6] Pull-side clearance beyond the door swing provides space for a forward reach to door hardware....
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
NABCO GT300-02L Center Pivot Outswing LH
Requires the Premium User plan or above. (Login or upgrade your account!)
-
NABCO GT300-04 Center Pivot Simultaneous Pair Outswing
Requires the Premium User plan or above. (Login or upgrade your account!)
-
NABCO GT300-01L Center Pivot Inswing RH Single With Panic
Requires the Premium User plan or above. (Login or upgrade your account!)
-
NABCO GT300-02R Center Pivot Outswing RH
Requires the Premium User plan or above. (Login or upgrade your account!)
-
NABCO GT300-03 Center Pivot Simultaneous Pair Inswing With Panic
Requires the Premium User plan or above. (Login or upgrade your account!)
-
NABCO GT300-05 Center Pivot Dual Inswing Outswing
Requires the Premium User plan or above. (Login or upgrade your account!)
-
R218 Doors, Doorways, and Gates (Section-by-Section Analysis)
R218 Doors, Doorways, and Gates (Section-by-Section Analysis) Doors, doorways, and gates to pedestrian facilities such as transit shelters must comply with applicable technical requirements...
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
4.13.6 MANEUVERING CLEARANCES AT DOORS
Minimum maneuvering clearances at doors that are not automatic or power-assisted shall be as shown in Fig. 25....
-
Must elevator doors remain open for 20 seconds?
LULA swing doors, private residence elevator doors, and platform lift gates and doors must remain open for 20 seconds minimum....
-
Power-Operated Doors or Gates
Platform lifts are required to have power-operated doors or gates....