The error in installation is attributed to the contractor and pressure to stay on schedule as the construction season came to a close for the winter. ...
Search Results "Commencement of Construction"
Commonly Searched Documents
-
Poured in Place Rubber
-
I. BACKGROUND AND JURISDICTION
The Palace is an existing facility originally constructed prior to the effective date of the ADA, and so is subject to the "readily achievable" barrier removal provisions of the ADA at 42...
-
B. The 2010 Standards Regarding Public Entrances Are Intended To Achieve the Same Result As the 1991 Standards Regarding Public Entrances
To that end, the ADA requires that new construction, such as Defendants’ stores, be “readily accessible to and usable by individuals with disabilities,” except where an entity can demonstrate...
-
Stages.
These costs arise both in the new construction and alteration contexts. ...
-
Application of ADA to places of lodging that contain individually owned units. (Section-by-Section Analysis)
In addition, as provided in Sec. 36.406(c), newly constructed facilities that contain accommodations intended to be used for transient lodging purposes must comply with the 2010 Standards...
-
4. Implications for Standards
The engineered surfaces were laid on flat floors and constructed so that there would be very little vibrations caused by long wavelength deviations....
-
Site Profiles by Surface Type
New playground sites were brought into the study each year as they were constructed and identified by the playground owners. ...
-
FAQ: How do I enter a New Document in my Corada WorkSpace?
Examples include: CHAPTER 1: APPLICATION AND ADMINISTRATION; 202.1 General; Subpart D -- New Construction and Alterations 'Section Number' - Applicable if the document you are inputting...
- AJW Architectural Products U6054 Unidoor Folded Towel Dispenser & Waste Receptacle Combination - Recessed
- AJW Architectural Products U6014 Unidoor Folded Towel Dispenser & Waste Receptacle Combination - Recessed
- AJW Architectural Products UG30-A Series UG30-A12 12" Concealed Set Screw Flange, 1.5" Diameter Grab Bar - Configuration A
- AJW Architectural Products UG20-A Series UG20-A12 12" Concealed Set Screw Flange, 1.25" Diameter Grab Bar - Configuration A
- BEST Door Lever Hardware Cylindrical Locks - 9K
- Sargent 10 Line Cylindrical Lock
- Salsbury Industries Designer Wood Locker Single Tier 3 Wide
- Salsbury Industries Solid Oak Executive Wood Locker Triple Tier 1 Wide
- Salsbury Industries Solid Oak Executive Wood Locker Double Tier 3 Wide
- Salsbury Industries Solid Oak Executive Wood Locker Triple Tier 3 Wide
- Salsbury Industries Designer Wood Locker Single Tier 1 Wide
- Willoughby Industries 2260 AquaDeck Lavatory Deck Contoured Front
- AJW Architectural Products U1521EA Series Automatic 120 Volt Hand Dryer, Satin Finish - Surface Mounted
- Salsbury Industries Solid Oak Executive Wood Locker Double Tier 1 Wide
- Neo-Metro Commercial Wall Mounted Pat Basin Featuring Dyson® Airblade™ Tap/Hand Dryer
- Wagner Instruments Mark-10 M4 Digital Force Gauge