Rather, a building that was newly designed and constructed at one time--and therefore subject to the accessibility standards in effect at the time--becomes an "existing facility" after it...
Search Results "Elevator Signal Timing"
-
"Existing Facility" (Section-by-Section Analysis)
-
DSA IR 11B-9: Accessibility Requirements for Solar Photovoltaic Systems at School Sites
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective IRs....
-
MARKETING PLAN
the design vehicle for shared use path design, in many cases, the bicycle is probably not the appropriate design vehicle for many elements of a shared use path facility, nor is it for signalized...
-
Scenario 3 – Disabilities in Remission
When initially diagnosed, Omar was weak and tired all the time, and, at times, unable to even get out of bed or dress or feed himself....
-
IV. Public Comments and Commenters
The Department received 562 timely comments. In addition, a substantial number of comments were received by the Department after the September 13, 1990 deadline....
-
III. DEFINITIONS
The term “Auxiliary Aids and Services” includes qualified interpreters provided either on-site or through video remote interpreting (“VRI”) services; note takers; real-time computer-aided...
-
Compliance Problems Due to Lack of Accessibility Guidelines
The commenters complained about the time that it has taken the Department to publish proposed guidelines, and the additional time it has taken to publish final Guidelines. Response....
-
AIAU Accessible Architecture: Designing for Success (Parts 1-3)
Instructor Bradley Gaskins Description To get your projects right the first time, design and accessibility should go hand-in-hand....
-
2. Accommodation in testing
Providing extra time to take a test may be a reasonable accommodation for people with certain disabilities, such as visual impairments, learning disabilities, or mental retardation....
-
Section 36.303(g)(7) Compliance Date for Providing Captioning and Audio Description
Although the Department expressed the belief that 6 months was sufficient time for movie theaters to order and install the necessary equipment, train employees on how to use the equipment...
- PEMKO 5 29/32" Floor Plates/Safety Treads No. 2266
- PEMKO 9 1/2" Floor Plates/Safety Treads No. 2286
- PEMKO 6-1/8" Floor Plates/Safety Treads No.19325
- PEMKO 3" Floor Plates/Safety Treads No. 19125
- PEMKO 8" Floor Plates/Safety Treads No. 228
- PEMKO 6 1/8" Floor Plates/Safety Treads No. 193
- PEMKO 3" Floor Plates/Safety Treads No. 191
- PEMKO 3" Floor Plates/Safety Treads No. 200
- PEMKO 4" Floor Plates/Safety Treads No. 192
- Pilot Rock CN-AMQ Amherst Collection Square Ash Receptacles
-
11B-1003.2.1 Boat slips
The vertical distance is 10 feet (3050 mm) between the elevation where the gangway departs the landside connection and the elevation of the pier surface at the lowest water level....
-
11B-1003.2.1 Boat slips
The vertical distance is 10 feet (3050 mm) between the elevation where the gangway departs the landside connection and the elevation of the pier surface at the lowest water level....
- Bradley 3-Station Express Crescent Lavatory System CRS-3
- Q90 Corporation CIL Management Suite Software