Features include a standard roll-in shower with a seat, comparable vanity, wardrobe, and door connecting to adjacent guest room. Furnishings include two beds. ...
Search Results "Elevator Door Timing"
-
Plan 3B: 12-Foot Wide Accessible Guest Room
-
Plan 2A: 13-Foot Wide Accessible Guest Room
Features include a standard roll-in shower with a seat, comparable vanity, wardrobe, and door connecting to adjacent guest room....
- Panda IS.14 All Aluminum IMPACT Lift & Slide System
-
Clear Floor or Ground Space
The clear floor space is permitted to overlap onto the landing area to provide access to this elevated window activity....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
- DORMA T900 Series Locks
- Corbin Russwin Inc. TL3700 Series of tubular locks
- Stanley QME 100 Series Grade 1 Heavy Duty Mortise Locks
- Stanley QMS 100 Series Grade 1 Heavy-Duty Mortise Locks
-
Polling places that cannot be remediated with temporary measures:
Building Entrance & Voting Area: The door at the designated accessible entrance does not provide at least 32 inches clear passage width when the door is open 90 degrees (1991 ADA Stds...
- Sargent Keypad Mortise Locks
-
Kawneer North America Sliding Track 1010 Sliding Mall Front
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Kawneer North America Commercial Flush Panel Flushline™ Entrances
Requires the Premium User plan or above. (Login or upgrade your account!)
- Wikk Industries Inc. PART# BPS SM-ING48 DB (710) with I36-3 Clear (628)
-
Stanley Access Technologies Dura-Care 7000 Manual Door System
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Stanley Access Technologies Dura-Care 7200 Manual Sliding Door
Requires the Premium User plan or above. (Login or upgrade your account!)
-
11.1 Q. Under the individual building test, how is the second step of the test performed, which involves measuring the slope of the finished grade between the entrance and applicable arrival points?
A. The slope is measured at ground level from the entrance to the top of the pavement of all vehicular and pedestrian arrival points within 50 feet of the planned entrance, or, if...
-
1(2)(a) Site impracticality due to terrain
(a) Site impracticality due to terrain. There are two alternative tests for determining site impracticality due to terrain: the individual building test provided in paragraph (i), or...
- Linnea Lever LL18
- Linnea Lever LL2
- Linnea Lever LL96
- Linnea Lever LL73
- Linnea Lever LL87