The surface of the bottom tread shall extend to a water depth of 18 inches (455 mm) minimum below the stationary water level. Advisory 1009.5.4 Transfer Steps....
Search Results "Kitchen Work Surface"
Commonly Searched Documents
-
Transfer Steps: ADA Standard Section 1009.5.4
-
Height: ADA Standard Section 1005.2.1
At least 25 percent of the railings, guards, or handrails shall be 34 inches (865 mm) maximum above the ground or deck surface....
-
Clear Width: ADA Standard Section 403.5.1
Section 403.5.1 covers the current ADA Standards for the clear width of walking surfaces that are part of an accessible route.
-
904.4.1 Parallel Approach
A portion of the counter surface that is 36 inches (915 mm) long minimum and 36 inches (915 mm) high maximum above the finish floor shall be provided....
-
§ 38.97(a)
The diameter or width of the gripping surface of interior handrails and stanchions shall be 11/4 inches to 11/2 inches or shall provide an equivalent gripping surface....
-
Some Lessons
when it works well....
- Meet Bruce Cast Video (open captions)
-
Two: Does the impairment limit any major life activities?
life.12 According to the Department’s regulations, major life activities include walking, seeing, hearing, breathing, caring for oneself, sitting, standing, lifting, learning, thinking, working...
-
Klingstone 400
) and a very small amount of loose fines coming to the surface....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
106.5.64 Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
STORY
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
Ramp
Ramp: A ramped surface was designed to insert between two steps and serve as an integrated sliding board to assist with the transfers by bridging the gap between steps. ...
-
Why test on straight courses and P-shaped turning courses?
However, the cost for producing these course designs with a number of surface materials would be very large....
-
STORY
[DSA-AC] That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
Background
the contaminant or force is removed, the surface returns to its original condition.”...
-
1630.2(o)(1)(II)
(II) Modifications or adjustments to the work environment, or to the manner or circumstances under which the position held or desired is customarily performed, that enable a qualified individual...
-
For a new public building, if EV charging equipment is not installed at this time, what is the extent of the infrastructure that an installer is required to show for plan check review?
RESPONSE: Plans and specifications must accurately describe the full extent of the work to be performed....
-
68.10(4) Commencement of Construction
Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or other construction related work...