Openings in the clear ground space and turning space surface shall not allow passage of a sphere more than 1/2 inch (13 mm) diameter....
Search Results "Surface Smoothness"
-
3.4.7 Openings
-
11B-403.5 Clearances
Walking surfaces shall provide clearances complying with Section 11B-403.5....
-
11B-403.5 Clearances
Walking surfaces shall provide clearances complying with Section 11B-403.5....
-
11B-809.10.8.7 Mirrors and towel bars
Where mirrors are provided the bottom edge of the reflective surface shall be 40 inches (1016 mm) maximum above the finish floor....
-
403.5 Clearances
Walking surfaces shall provide clearances complying with 403.5....
- AJW Architectural Products US18 Collapsable Security Hook, Chase Mounting
- Bradley 1-Station Verge Lavatory System LVGD1
- Moen M–BITION Chrome One-Handle Lavatory Faucet 8430
- Bradley 2-Station Verge Lavatory System LVGD2
- Bradley 3-Station Verge Lavatory System LVGD3
- Moen M–BITION Classic Brushed Nickel One-Handle Lavatory Faucet 8437CBN
- Moen M–BITION Chrome One-Handle Lavatory Faucet 8400
-
11B-1009.5.7 Grab bars
Where a grab bar is provided on each step, the tops of gripping surfaces shall be 4 inches (102 mm) minimum and 6 inches (152 mm) maximum above each step and transfer platform....
-
11B-705.1.1.2 Dome spacing
Truncated domes in a detectable warning surface shall have a center-to-center spacing of 2.3 inches (58 mm) minimum and 2.4 inches (61 mm) maximum, and a base-to-base spacing of 0.65 inch...
-
Accessible Routes
The accessible route must comply with ADAAG provisions for the location, width (minimum of 36 inches), passing space, head room, surface, slope (maximum of 1:12 or 8.33%), changes in level...
-
Backrests
Backrests: The backrest design for platform 1, the first surface that participants transferred to from their WMD as seen in Table 2, was based on bench seat back supports in section 903.5...
-
11B-606.3 Height
Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (864 mm) maximum above the finish floor or ground....
-
1017.5 Tread Obstacles
The vertical alignment of joints in concrete, asphalt, or board surfaces on trails can be tread obstacles....
-
Instrumentation for Analysis
Upon installation, the playground owner completed a questionnaire (Appendix B) on the type, size and intended age group of the playground, the total cost for the equipment, surface materials...
-
Additional Technical Criteria Considered for Handrails on Ramps
These technical criteria are available at http://www.access-board.gov/ada-aba/final.cfm#a505 and address continuity, height, clearance, gripping surface, cross section, surfaces, fittings...
-
11B-505.10.3 Bottom extension at stairs
Extension shall return to a wall, guard, or the landing surface, or shall be continuous to the handrail of an adjacent stair flight....
-
11B-606.3 Height
Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (864 mm) maximum above the finish floor or ground....
-
11B-606.3 Height
Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (864 mm) maximum above the finish floor or ground....
-
1009.5.7 Grab Bars
Where a grab bar is provided on each step, the tops of gripping surfaces shall be 4 inches (100 mm) minimum and 6 inches (150 mm) maximum above each step and transfer platform....