Changes to the Compliance Date In the final rule, movie theaters have 18 months to acquire and install the necessary equipment to provide closed movie captioning and audio description...
Search Results "CPE: Customer Premises Equipment"
Commonly Searched Documents
-
F. Measures Taken To Limit Impact on Small Entities
-
‘‘Auxiliary aids and services.’’
While the proposed rule expressly included television decoder equipment as an auxiliary aid or service, it did not mention captioning itself....
-
Accessible golf cars.
Other commenters stated that accessible golf cars were too expensive or were specialized equipment that individuals with disabilities should purchase for themselves....
-
"Video Remote Interpreting (VRI) Services'' (Section-by-Section Analysis)
and the video connection, although there may be relatively inexpensive initial costs to the title III entities to purchase the videophone or camera for on-line video connection, or other equipment...
-
11B-404.2.9 Door and gate opening force
Exterior doors to machinery spaces including, but not limited to, elevator pits or elevator penthouses; mechanical, electrical or communications equipment rooms; piping or equipment catwalks...
-
Installation
The intensive installation requirements also made it necessary for the contractor to return to sites for repairs due to vandalism or patches at locations where equipment may have been removed...
-
7.6. Measures Taken to Limit Impact on Small Entities
Changes to the Compliance Date In the final rule, movie theaters have 18 months to acquire and install the necessary equipment to provide closed movie captioning and audio description in...
-
ADA OBLIGATIONS AND ACTIONS TO BE TAKEN BY THE CITY AND PPD
The information provided in the Communication Assessment Form will be input into a Premise History Report in PPD’s Computer Assisted Dispatch (CAD) system to inform officers of the needs...
- Spectrum Aquatics Gallatin Water Powered Assisted Access Lift
- H-7101-B Wall Sconce by Hi-Lite
- Kohler Steward® Hybrid High-Efficiency Urinal
- Georgia-Pacific SofPull® High-Capacity Automated Roll Towel Dispenser
- H-12252-B Wall Sconce by Hi-Lite
- AJW Architectural Products UG120-U Series UG120-U 29" Swing-Up, 1.25" Diameter Grab Bar - Configuration U
- Neo-Metro Commercial Curved Front, Wall Mounted System M2 Basin 8980 Series
- PEMKO 5" Heavy Duty Threshold No. 1715
- Landscape Forms Inc. Morrison Floating Frame Bench
- Tile Tech Pavers® Coral-Pave™
- LS-80 Basic Stationary IR System
- H-702-B Wall Sconce by Hi-Lite
- H-7102-B Wall Sconce by Hi-Lite
- Landscape Forms Inc. Select Modular Steel Recycling Units
- H-701-B Wall Sconce by Hi-Lite
- Advent Sebring Wall Sconce with Emergency Battery Back-Up