Slide Locking Buttons including Emergency Release CL100 Mortise Lock Case IMPORTANT: Operable parts of hardware must be mounted 34 inches (865mm) minimum and 48 inches (1220 mm) maximum...
Search Results "Expected Maximum Flight Duration"
Commonly Searched Documents
- Cavity Sliders CL100 ADA LaviLock Hardware Set with 'Vacant / In Use' Indicator
- Stanley FBB 266 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Stanley FBB 268 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Stanley FBB 264 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Palmer Fixture BluStorm® Bolt High Speed Hand Dryer HD0923
- Stanley FBB 269 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
-
Transfer Protocols
Maximum and Minimum Height Transfers: One the 72 study participants (P1) developed hip pain and did not attempt these two transfers....
-
1. Question: What is the minimum width needed for a non-level boarding railroad passenger station platform to meet the accessibility requirements of the Americans with Disabilities Act (ADA)?
inches above the platform in the down position with a connecting ramp slope not exceeding 1:8 (49 CFR 38.95(b)(8), 38.125(b)(8)), which could result in a ramp to the lift platform being a maximum...
-
11B-604.5.1 Side wall
The side wall grab bar shall be 42 inches (1067 mm) long minimum, located 12 inches (305 mm) maximum from the rear wall and extending 54 inches (1372 mm) minimum from the rear wall with...
-
1134A.6 Showers
A water closet may project a maximum of 12 inches (305 mm) into the opening, provided that a minimum of 36 inches (914 mm) clear space is maintained between the water closet and the shower...
-
Program Accessibility
Instead, the town holds the town meetings, as well as other public meetings where large numbers of the public are expected to attend, in the high school auditorium....
-
Expert Report of Jeromy G. Murphy, American Construction Investigations, LTD (August 6, 2018)
Sidewalks & Walkways: The cross slope in the designated accessible route exceeds the maximum slope allowed of 1:48 (1991 ADA Stds 4.3.7; 2010 ADA Stds 403.3)....
-
§ 382.61 Training
(b) Each carrier operating only aircraft with 19 or fewer passenger seats shall provide training for flight crewmembers and appropriate personnel to ensure that they are familiar with the...
-
Readily Achievable (Section-by-Section Analysis)
If, for example, the subsidiary is responsible for product design but the parent company is responsible for overall marketing, it may be appropriate to expect the parent company to address...
-
Background
Clear guidelines are needed to assist airline personnel and people with disabilities in knowing what to expect and what to do when these assessments are made....
-
Issue 4: Wrong pole! …Wrong message!
APS is closer to the departure curb and curb ramp for crossing straight ahead (in line with the photographer’s direction of travel), a pedestrian hearing the sound from that APS would expect...
-
Results comparison with current accessibility guidelines
Accessibility guidelines concerning handholds and grab bars where transfers are expected are not very detailed and are absent in the guidelines for amusement park rides. ...
-
Fire Department Issues
Most who did what they were expected to do--wait to be rescued—died.”...
-
Best Practice Recommendations for Layout Planning
If 10% or more of participants are expected to use mobility aids, plan for 30% additional space....
- Westchester Disabled On the Move, Inc., (WDOMI) - Yonkers, NY
-
1115B.4.1, Item 1
The centerline of the accessible water closet shall be 16 inches (405 mm) minimum and 18 inches (457 mm) maximum from the side wall or partition....
-
5.4.4 Transfer Support Distance from Transfer Surface Recommendations for M301 and M302
The gripping surface of the transfer support should be located 1 ½ inches maximum measured horizontally from the adjacent edge of the transfer surface....
-
Alterations to Existing Facilities
Alterations to Existing Facilities The draft guidelines required alterations to existing facilities to comply with the requirements for new construction to the maximum extent feasible...