Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. Advisory 11B-206.7.5 Existing site constraints....
Search Results "Boarding Ramp"
-
11B-206.7.5 Existing site constraints
-
206.7.5 Existing Site Constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. Advisory 206.7.5 Existing Site Constraints....
-
11B-244.1 General
The CBC requires raised areas of the facility to provide access by ramp, special access lift or elevator....
-
1009.2.1 Elevators required
installed in accordance with Section 903.3.1.1 or 903.3.1.2, the elevator shall not be required as part of the accessible means of egress on floors or occupiable roofs provided with a ramp...
-
11B-244.1 General
The CBC requires raised areas of the facility to provide access by ramp, special access lift or elevator....
-
Platform Lifts in Residential Dwelling Units
The Board included this provision in the final rule since it considers lift access appropriate in such spaces....
-
810.5.2 Detectable Warnings
Platform boarding edges not protected by platform screens or guards shall have detectable warnings complying with 705 along the full length of the public use area of the platform....
-
1011.4, Item 2
Each exit door that is required to comply with Section 1011.1, and that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit...
-
1013.4, Item 2
Each exit door that is required to comply with Section 1013.1, and that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit...
-
§ 37.165(f)
(f) Where necessary or upon request, the entity's personnel shall assist individuals with disabilities with the use of securement systems, ramps and lifts....
-
§ 38.81(a)
(a) Any stepwell or doorway with a lift, ramp or bridge plate immediately adjacent to the driver shall have, when the door is open, at least 2 foot-candles of illumination measured on the...
-
i) Grievance Procedures
City's grievance procedure.22 At trial, Kirola testified to having made a single request for the removal of an access barrier; namely, her July 2006 request that the City install curb ramps...
-
R306.3.1 Separation
European and Australian roundabouts provide a 610 mm (24 inch) width of tactile surface treatment from the centerline of the curb ramp or blended transition across the full width of the...
-
III-4.4300 Standards to apply
Are portable ramps permitted? Yes, but only when the installation of a permanent ramp is not readily achievable....
-
Where Platform Lifts are Permitted [§206.7]
recreational boating facilities, and fishing piers and platforms They also are permitted in new construction where topography or other existing exterior site constraints make a ramp...
-
1013.4 Raised character and braille exit signs
Each exit door that is required to comply with Section 1013.1, and that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit...
-
B. Accessible Routes To All Service/Activity Areas
Yes ___ No ___ Number of Steps: _______ If No, is there a ramp, lift, or elevator? Yes ___ No ___ Type of device: _______ B1-b....
-
11B-240.2.1 Ground level play components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
Feature 2 - Routes to the Building Entrance
Where ramps are used, they cannot be steeper than 1:12 (8.33% incline). Ramps with a vertical rise of more than 6 inches must have handrails on both sides....
-
F240.2.1 Ground Level Play Components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
11B-240.2.1 Ground level play components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
11B-240.2.1 Ground level play components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
240.2.1 Ground Level Play Components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
240.2.1 Ground Level Play Components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....