This is because, at the time of its remanufacture, the bus would have been made as accessible if feasible....
Search Results "Phase Timing"
-
Section 37.73 Purchase or Lease of Used Non-Rail Vehicles by Public Entities Operating a Fixed Route System
-
Applicability to Carrier Web Sites
Despite their disagreements with the proposed technical standard, the scope of covered Web site content, and the implementation time frame, both U.S. and foreign carriers were nearly unanimous...
-
Senate Approval
This meant that the committee report had to be filed by August 30 in order to give Senators and their staffs ample time to review the issues....
-
Sections 35.108(f) and 36.105(f)—Is Regarded as Having Such an Impairment
At the time of the Arline decision, there was no requirement that the individual demonstrate that he or she, in fact, had or was perceived to have an impairment that substantially limited...
-
II-9.2000 Complaints
Is there a time period in which a complaint must be filed? Yes....
- TownSteel FME4030 Mortise Lockdown Rigid Trim Security Cylinder
- TownSteel FME4020 Mortise Lockdown Clutched Trim
- TownSteel FME4010 Mortise Lockdown Rigid Trim RFID Mortise
- EnChroma® Cx Explorer Lifestyle Glasses for the Color Blind
- Simplified Building Concepts ADA Handrail
- TownSteel FCE4030 Cylindrical Lockdown Rigid Trim Security Cylinder RFID Cylindrical
- TownSteel XME9040 Mortise, Clutched Trim Security Cylinder Mortise Keypad
-
Opening Remarks and Introductions
But he did enlist – Stuart and I and Vijay and Jim go back several decades, and Stuart was principal – at the time Oudens and Knoop, Associates....
-
Evaluation of transfers
The next phase of study will investigate further the usefulness of different type of handhelds and grab bar positioning during transfers....
-
Section 1193.2 Scoping (Section-by-Section Analysis)
If a product "originates, routes or terminates telecommunications" it is covered whether the product does that most of the time or only a small portion of the time....
-
6. Settlement Approval Process
Preliminary Approval Order, the City shall cause notice of the settlement to be published for four (4) consecutive weeks in the following papers of general circulation: The Los Angeles Times...
- Missouri Department of Elementary And Secondary Education: Vocational Rehabilitation (VR)
- Rebuilding Together Howard County - Columbia, MD
- Institute for Health and Aging
- Dancing Dots - Valley Forge, PA
- Rebuilding Together Saratoga County - Wilton, NY
- Acoustiguide exSite Series Wand-Style Audio Guide