Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. Advisory F206.7.5 Existing Site Constraints....
Search Results "Boarding Ramp"
-
F206.7.5 Existing Site Constraints
-
R202.3.3 Reduction in Access Prohibited
Sidewalk improvements that correct existing excessive cross slope should be carefully planned to avoid creating excessive slope in curb ramps or adding a step at existing building entrances...
-
206.7.5 Existing Site Constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator technically infeasible. Advisory 206.7.5 Existing Site Constraints....
-
§ 37.43(d)
An accessible path of travel may include walks and sidewalks, curb ramps and other interior or exterior pedestrian ramps, clear floor paths through corridors, waiting areas, concourses,...
-
Scoping for Guest Rooms
The Board has included some limited changes from the original ADAAG scoping for consistency with the International Building Code (IBC)....
- Figure 1005.3.2 Extended Ground or Deck Surface at Fishing Piers and Platforms – Drawing from the U.S. Access Board
- Figure 608.2.3 Alternate Roll-In Type Shower Compartment Size and Clearance – Drawing from the U.S. Access Board
- Figure 703.4.1 Height of Tactile Character Above Finish Floor or Ground – Drawing from the U.S. Access Board
- Figure 608.2.2 Standard Roll-In Type Shower Compartment Size and Clearance – Drawing from the U.S. Access Board
- Figure 608.5.3 Alternate Roll-In Type Shower Compartment Control Location – Drawing from the U.S. Access Board
- Figure 608.5.2 Standard Roll-In Type Shower Compartment Control Location – Drawing from the U.S. Access Board
-
§382.57(c)(5)(i)(D)(3)
(3) Printed copies of a carrier's contract of carriage, applicable fare rules, itineraries and other similar supplemental information that may be included with a boarding pass are not required...
-
810.5.2 Detectable Warnings
Platform boarding edges not protected by platform screens or guards shall have detectable warnings complying with 705 along the full length of the public use area of the platform....
-
MITA Advisory Committee Members
ACCESS BOARD ADVISORY COMMITTEE RE: NPRM: M301.2.1 AND M302.2.1 HEIGHT...
-
§27.71(k)(5)(i)(D)(3)
(3) Printed copies of a carrier's contract of carriage, applicable fare rules, itineraries and other similar supplemental information that may be included with a boarding pass are not required...
-
§ 382.57(c)(5)(i)(D)(3)
(3) Printed copies of a carrier's contract of carriage, applicable fare rules, itineraries and other similar supplemental information that may be included with a boarding pass are not required...
-
§ 27.71(k)(5)(i)(D)(3)
(3) Printed copies of a carrier's contract of carriage, applicable fare rules, itineraries and other similar supplemental information that may be included with a boarding pass are not required...
-
§ 38.155(b)
(b) Where provided within passenger compartments, handrails or stanchions shall be sufficient to permit safe on-board circulation, seating and standing assistance, and alighting by persons...
-
707 Automatic Teller Machines and Fare Machines
Federal procurement law requires that ITMs purchased by the Federal government comply with standards issued by the Access Board under Section 508 of the Rehabilitation Act of 1973, as amended...
-
811 Storage
These provisions have been moved to Chapter 8, which the Board considers a more appropriate location because it covers accessible spaces and elements....
-
707 Automatic Teller Machines and Fare Machines
Federal procurement law requires that ITMs purchased by the Federal government comply with standards issued by the Access Board under Section 508 of the Rehabilitation Act of 1973, as amended...
-
Resting Intervals [1018.8]
When the surface of the resting interval is constructed of asphalt, concrete, or boards, the slope of the resting interval must be no steeper than 1:48 (2 percent) in any direction....
-
Delimitations
Access Board in the Notice of Proposed Rulemaking for Outdoor Developed Areas (U.S. Access Board, 2007)....
-
II. Summary of Significant Issues Raised By the Public Comments in Response to the Initial Regulatory Flexibility Certification.
The Board received a number of comments regarding the application of the term "readily achievable."...