The provisions of this code shall apply to the construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition...
Search Results "Construction Site"
-
[A] 101.2 Scope
-
1. b. ADA Accessibility Guidelines for Buildings and Facilities (ADAAG)
Technical requirements are to be applied during the design, construction, and alteration of buildings and facilities covered by titles II and III of the ADA to the extent required by regulations...
-
Chapter 10: Recreation Facilities
The final rule adds technical requirements to Chapter 10 for outdoor constructed features (1011); parking spaces within camping units and picnic units and pull-up spaces at dump stations...
-
F206.1 General
Accessible routes shall not be required where camping facilities, picnic facilities, viewing areas, or outdoor constructed features are provided on trails. 3....
-
3.4.1 General
When a new viewing area is constructed, or an existing viewing area is altered or reconstructed, if a condition for exception in section 1.1 prohibits full compliance with a specific requirement...
-
III-9.8000 Certification and barrier removal in existing facilities
The Department will measure equivalency against subpart D of the title III rule, New Construction and Alterations....
-
DOT’s ADA Standards (2006)
The current edition of the standards applies to new construction and alterations undertaken after November 29, 2006....
-
Curb Ramps [§406]
DOJ’s 2010 ADA Standards require curb ramps at newly constructed or altered streets, highways, and street-level pedestrian walkways to provide an accessible route for pedestrians at intersections...
-
§ 35.108(d)(3)(i)
(i) At all times taking into account the principles set forth in the rules of construction, in determining whether an individual is substantially limited in a major life activity, it may...
-
1.1.7.3.1 Detached one- and two-family dwellings
lodging houses, live/work units, townhouses not more than three stories above grade plane in height with a separate means of egress, and their accessory structures, may be designed and constructed...
-
11B-201.3 Temporary and permanent structures
Structures and equipment directly associated with the actual processes of construction are not required to be accessible as permitted in Section 11B-203.2. ◼...
-
11B-216.4.1 Exit doors
An exit passageway is a horizontal exit component that is separated from the interior spaces of the building by fire-resistance-rated construction and that leads to the exit discharge or...
-
201.3 Temporary and Permanent Structures
Structures and equipment directly associated with the actual processes of construction are not required to be accessible as permitted in 203.2. ...
-
11B-233.3.4.2 Alterations to individual residential dwelling units
and 11B-233.3.1.3 shall apply to the total number of residential dwelling units that are altered under a single contract, or are developed as a whole, whether or not located on a common site...
-
Text Telephones (TTY)
Section 4.1.3(17) of the 1991 Standards requires a public TTY to be provided if there are four or more public pay telephones at a site and at least one is in an interior location....
-
15. When are "path of travel" obligations triggered?
Not all alterations to a site that contains a play area would trigger "path of travel" obligations....
-
11B-216.6 Entrances
The sign program should be designed to provide the appropriate level of signs at points necessary for convenient navigation around the site....
-
11B-233.3.4.2 Alterations to individual residential dwelling units
and 11B-233.3.1.3 shall apply to the total number of residential dwelling units that are altered under a single contract, or are developed as a whole, whether or not located on a common site...
-
11B-233.3.4 Alterations
, or 11B-809.4 is technically infeasible, or where it is technically infeasible to provide an accessible route to a residential dwelling unit, the entity shall be permitted to alter or construct...
-
II-6.2100 General.
ILLUSTRATION 1: A public entity is designing and constructing a playground....
-
Section 4.1.1, Application (Preamble, Section-by-Section Analysis)
Section 4.1.1, Application, provides that all areas of newly designed or newly constructed buildings and facilities and altered portions of existing buildings and facilities required to...
-
B. PUBLIC RIGHT-OF-WAY
DPW's Disability Access Coordinator is responsible for monitoring access issues related to the public right-of-way; reviewing publicly-funded construction projects designed by or contracted...
-
d) Paving Guidelines
Guidelines permit the City to defer curb ramp installation for a period of up to twenty-four months in cases where there is a pre-planned project that would require demolition of the newly constructed...