(i) Where existing elements prohibit strict compliance with the clearance requirements of 4.13.5, a projection of 5/8 in (16 mm) maximum will be permitted for the latch side door stop....
Search Results "Pedestrian Elements"
Commonly Searched Documents
-
4.1.6(4)(d)
-
4.14.1 MINIMUM NUMBER
They shall also be connected by an accessible route to all accessible spaces or elements within the building or facility....
-
11B-203.10 Raised refereeing, judging and scoring areas
An accessible route complying with Division 4 shall be provided to the ground- or floor-level entry points, where provided, of stairs, ladders or other means of reaching the raised elements...
-
§ 37.3 Alteration
change to an existing facility, including, but not limited to, remodeling, renovation, rehabilitation, reconstruction, historic restoration, changes or rearrangement in structural parts or elements...
-
1.2 Background
Detectable warning surfaces are intended primarily to provide a tactile cue to pedestrians who are blind or have visual impairments....
- USDA Forest Service Built Environment Image Guide (BEIG)
-
F205.1 General
Operable parts on accessible elements, accessible routes, and in accessible rooms and spaces shall comply with 309. EXCEPTIONS: 1....
-
205.1 General
Operable parts on accessible elements, accessible routes, and in accessible rooms and spaces shall comply with 309. EXCEPTIONS: 1....
-
New construction and alteration requirements
Alterations to facilities, spaces or elements (including renovations) on or after January 26, 1992, also must comply with the Standards....
-
4.1.6(3)(d)
EXCEPTION: If the cost of the elements and spaces required by 4.1.6(3)(a), (b), or (c) exceeds 15 percent of the total cost of all other alterations, then a schedule may be established by...
-
11B-225.3 Self-service storage facilities
Although there are no technical requirements that are unique to self-service storage facilities, elements and spaces provided in facilities containing self-service storage spaces required...
-
ALTERATION
to, remodeling, renovation, rehabilitation, reconstruction, historic restoration, resurfacing of circulation paths or vehicular ways, changes or rearrangement of the structural parts or elements...
-
Technically Infeasible
removing or altering a load-bearing member that is an essential part of the structural frame; or because other existing physical or site constraints prohibit modification or addition of elements...
-
Basic Features
Careful planning and design will incorporate elements such as a wider entrance door, adequate clear floor space, appropriate placement and models of fixtures and furniture, and grab bars...
-
Dressing, Fitting, or Locker Rooms
There must be an accessible route through the door and to all elements required to be accessible in the room....
-
Accessible Route
Accessible Route - A continuous unobstructed path connecting all accessible elements and spaces of a building or facility....
-
306.3.3 Minimum Required Depth
Where knee clearance is required under an element as part of a clear floor space, the knee clearance shall be 11 inches (280 mm) deep minimum at 9 inches (230 mm) above the finish floor...
-
4.1.2(7) Building Signage
Elements and spaces of accessible facilities which shall be identified by the International Symbol of Accessibility and which shall comply with 4.30.7 are:...
-
Context
Shapes of landscape features such as mountains were easily identifiable but unexpected elements such as a sailboat were not....
-
F245.4.2 Routes to and within Common Use and Public Use Areas
access route to connect each picnic unit with mobility features with common use and public use areas serving the unit; and at least one outdoor recreation access route to connect accessible elements...
-
Clear Floor or Ground Space and Turning Space
Clearances are required at accessible elements, fixtures, and controls so that people with disabilities, including those who use wheelchairs, can approach and use them....
-
1.3 General Exceptions
Sites, buildings, facilities and elements are exempt from these requirements to the extent specified by Section 11B-203."...
-
Sections 4.2 Through 4.35 (Section-By-Section Analysis and Response to Comments)
- Sections 4.2 Through 4.35 (Section-By-Section Analysis and Response to Comments) Sections 4.2 through 4.35 contain the technical specifications for elements and spaces required to be...