However, the cost for producing these course designs with a number of surface materials would be very large....
Search Results "Gripping Surface"
Commonly Searched Documents
-
Why test on straight courses and P-shaped turning courses?
-
STORY
[DSA-AC] That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
- Kohler Veil™ One-Piece Elongated Dual-Flush Wall-Hung Toilet With Reveal® Quiet-Close™ Seat
- Mockett DH2A/BB-SSS Curved Door Handle Back to back Small
- Alliance Laundry Systems Hardmount Washer Extractor Front Control Stainless Steel Cabinet
- Delta Palm Grab Bar Hand Shower 53001-DS
-
Literature Cited
Standard specification for impact attenuation of surface systems under and around playground equipment, ASTM F1292....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
106.5.64 Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
11B-1009.5.4 Transfer steps
The surface of the bottom tread shall extend to a water depth of 18 inches (457 mm) minimum below the stationary water level. Advisory 11B-1009.5.4 Transfer steps....
-
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
-
Railings—Guardrails, Handrails, and Safety
If the guardrail has openings that are less than 34 inches (865 millimeters) above the walking surface, they must be small enough to prevent a 4-inch (100-millimeter) sphere from passing...
-
904.4.1 Parallel Approach
A portion of the counter surface that is 36 inches (915 mm) long minimum and 36 inches (915 mm) high maximum above the finish floor shall be provided....
-
Objectives
The original development work, though targeted toward playground improvements, was eventually seen as a potential improvement for trail surfacing....
-
(c) Thresholds at patio, deck or balcony doors
The final Guidelines provide that exterior deck, patio, or balcony surfaces should be no more than 1/2 inch below the floor level of the interior of the dwelling unit, unless they are constructed...
-
904.4.1 Parallel Approach
A portion of the counter surface that is 36 inches (915 mm) long minimum and 36 inches (915 mm) high maximum above the finish floor shall be provided....
-
11B-303.5 Warning curbs
Abrupt changes in level exceeding 4 inches (102 mm) in a vertical dimension between walks, sidewalks or other pedestrian ways and adjacent surfaces or features shall be identified by warning...
-
GUARD OR GUARDRAIL
A building component or a system of building components located at or near the open sides of elevated walking surfaces that minimizes the possibility of a fall from the walking surface to...
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....