M–DURA faucets feature solid cast brass construction 1255® duralast® ceramic cartridge designed to offer the smooth feel and reliable operation of a new faucet from the first time...
Search Results "Ceramic Tile Flooring"
- Moen M–Dura Chrome One-Handle Multi-Purpose Faucet 8137
- Grohe Eurosmart Lavatory Centerset S-Size Faucet
- Grohe Veris Three-Hole Basin Mixer 1/2" M-Size
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8714
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8717
- Moen M–DURA Chrome Two-Handle Lavatory Faucet 8210SM
- Moen M–Dura Chrome One-Handle Multi-Purpose Faucet 8125
- American Standard Monterrey 8" Widespread Faucet, Rigid/Swivel Gooseneck Spout
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8713
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8707
- Moen M–Dura Chrome Two-Handle Kitchen Faucet 8225SM
- Safepath EZ Edge™ Transition
-
1134A.5 Bathtubs
Floor space....
-
206.2.3 Multi-Story Buildings and Facilities
However, if the laundry room on the first floor is restricted to use by residents on the first floor, and the second floor laundry room is for use by occupants of the second floor, then...
-
603 Toilet and Bathing Rooms
Section 603 covers toilet and bathing rooms and includes requirements for clear floor space, wheelchair turning space, permitted overlaps of various space requirements, and doors....
-
11B-306.3.1 General
Space under an element between 9 inches (229 mm) and 27 inches (686 mm) above the finish floor or ground shall be considered knee clearance and shall comply with Section 11B-306.3....
-
4(3)
unit that is served by the building elevator (a) is the primary entry to the unit; (b) complies with Requirements 2 through 7 with respect to the rooms located on the entry/accessible floor...
-
1(2)(b) Site impracticality due to unusual characteristics
Unusual characteristics include sites located in a federally-designated floodplain or coastal high-hazard area and sites subject to other similar requirements of law or code that the lowest floor...
-
Recessed Objects
Alcoves must be sized to accommodate required clear floor space at accessible elements....
-
Do basements count in determining a facility’s story count?
As defined in the Standards, a “story” pertains to those portions of buildings “designed for human occupancy included between the upper surface of a floor and upper surface of the floor...
-
11B-306.3.1 General
Space under an element between 9 inches (229 mm) and 27 inches (686 mm) above the finish floor or ground shall be considered knee clearance and shall comply with Section 11B-306.3. ...
-
11B-306.3.1 General
Space under an element between 9 inches (229 mm) and 27 inches (686 mm) above the finish floor or ground shall be considered knee clearance and shall comply with Section 11B-306.3....
-
Professional Office of a Health Care Provider
The facility housing the “professional office of a health care provider” only includes floor levels housing at least one health care provider, or any floor level designed or intended for...
- Waterless Co. No-Flush Urinal Anza 2005