In § 35.151(c)(2) of the NPRM, the Department proposed that the commencement of construction serve as the triggering event for applying the proposed standards to new construction and alterations...
Search Results "CSI: Construction Specification Institute"
-
Triggering event. (Section-by-Section Analysis)
-
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments)
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments) According to paragraph (a)(2), a facility is subject to the new construction requirements...
-
4. Access to Newly Constructed and Altered Facilities
Access to Newly Constructed and Altered Facilities In implementing the program, the City will ensure that all future construction and alteration work on Pedestrian Facilities will be...
-
Sec.36.401 New construction
Sec.36.401 New construction....
-
Power Operation: ADA Standard Section 408.3.2.1
Section 408.3.2.1 covers the current ADA Standards for the power operation of swinging doors on limited-use/limited-application elevators.
-
4.1.1(5)(a)
(a) In new construction, a person or entity is not required to meet fully the requirements of these guidelines where that person or entity can demonstrate that it is structurally impracticable...
-
1011.2 Clear Ground Space
This section requires a clear ground space to be provided at outdoor constructed features and includes specific provisions for the size and location (1011.2.1), surface (1011.2.2), slope...
-
Section 201.1
Section 201.1 The basic scoping requirement requires all areas of newly designed and newly constructed buildings and facilities to be accessible....
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....
-
1011.2 Clear Ground Space
A clear ground space complying with 1011.2 shall be provided at outdoor constructed features. EXCEPTIONS: 1. ...
-
Construction and Maintenance Practices
Even the best universal design can be ruined, often unintentionally, by construction or maintenance practices that turn accessible design features into barriers....
-
12183(a) Application of term
(a) Application of term Except as provided in subsection (b) of this section, as applied to public accommodations and commercial facilities, discrimination for purposes of section...
-
Rulemaking History
July 26, 1991, one year after the ADA was signed into law, the Board published the ADA Accessibility Guidelines (ADAAG).3 The Board supplemented ADAAG to include additional requirements specific...
-
Amusement rides
Section 234 of the 2010 Standards provides accessibility guidelines for newly designed and constructed amusement rides....
- Pilot Rock N-20 Series Charcoal Grill
-
Section 5 Guidelines
For each of these seven requirements, the Department adopted the corresponding Option One guidelines, but changes were made to certain of the Option One design specifications....
-
§ 36.406(a)(2)
(2) New construction and alterations subject to this part shall comply with the proposed standards if physical construction of the property commences on or after [date six months after the...
-
§ 36.406(a)(1)
(1) New construction and alterations subject to this part shall comply with the 1991 Standards if physical construction of the property commences before [date six months after the effective...
-
Power Operation: ADA Standard Section 409.3.1
Section 409.3.1 covers the current ADA Standards for the power operation of private residence elevator doors.
- Lynx Grills Inc. 30” Grill ProSear Burner & 1 Stainless Steel Burner (L500ADA)
- Lynx Grills Inc. 36” Grill - 1 ProSear Burner & 2 Stainless Steel Burners (L600ADA)
- Lynx Grills Inc. 36” Grill 1 ProSear Burner & 2 Stainless Steel Burners with Rotisserie (L600ADAR)