Unless otherwise specified, clear floor or ground space shall be permitted to include knee and toe clearance complying with 306....
Search Results "Building Permit"
-
305.4 Knee and Toe Clearance
-
§382.43(b)
(b) The requirements of paragraph (a) do not apply to you in any country in which the telecommunications infrastructure does not readily permit compliance....
-
M101.4 Equivalent Facilitation
The use of alternative designs or technologies that result in substantially equivalent or greater accessibility and usability than specified in the MDE Standards is permitted....
-
303.2 Vertical
Changes in level of ¼ inch (6.4 mm) high maximum shall be permitted to be vertical. Figure 303.2 Vertical Change in Level...
-
305.4 Knee and Toe Clearance
Unless otherwise specified, clear floor or ground space shall be permitted to include knee and toe clearance complying with 306....
-
305.4 Knee and Toe Clearance
Unless otherwise specified, clear floor or ground space shall be permitted to include knee and toe clearance complying with 306....
-
Ramps
Slightly steeper running slopes are permitted for short ramps (maximum 6” rise) where space is limited (§405.2, Ex.)....
-
§ 38.77(a)
(a) Handrails and stanchions shall be sufficient to permit safe boarding, on-board circulation, seating and standing assistance, and alighting by persons with disabilities....
-
305.4 Knee and Toe Clearance
Unless otherwise specified, clear floor or ground space shall be permitted to include knee and toe clearance complying with 306....
-
407.3.3.2 Contact
The device shall not require physical contact to be activated, although contact is permitted to occur before the door reverses....
-
Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
Sec. 469.054(c)(3)
(3) the processing of an application for a variance from accessibility standards for a building or facility....
-
3.2 Dimensional Tolerances
All dimensions are subject to conventional building industry tolerances for field conditions....
-
Construction (Trail Terminology)
Construction is building a new trail or segment of trail where there was no trail before....
-
4.1.6(1) General
Alterations to existing buildings and facilities shall comply with the following:...
-
3.2 DIMENSIONAL TOLERANCES
All dimensions are subject to conventional building industry tolerances for field conditions....
-
ELEMENT
[DSA-AC] An architectural or mechanical component of a building, facility, space or site....
-
OCCUPANT LOAD
The number of persons for which the means of egress of a building or portion thereof is designed....
-
ELEMENT
[DSA-AC] An architectural or mechanical component of a building, facility, space or site....
-
OCCUPANT LOAD
The number of persons for which the means of egress of a building or portion thereof is designed....
-
106.5.3 Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
907.2.8 Group R-1
Exceptions: A manual fire alarm system is not required in buildings not over two stories in height where all individual guestrooms and contiguous attic and crawl spaces are separated...
-
Location [4.6.2] and Dispersion
For example, spaces for an out-lying lot can be placed in a lot closer to the building served since accessible spaces must be located on the shortest accessible route to an accessible facility...
-
Location and Signage
Location and Signage ADAAG does not specify where text telephones are to be located on a site or in a building (except in hospitals, airports, and transit stations)....