The vertical distance is 10 feet (3050 mm) between the elevation where the gangway departs the landside connection and the elevation of the pier surface at the lowest water level....
Search Results "Curb Ramp Surface"
Commonly Searched Documents
-
11B-1003.2.1 Boat slips
-
4.1.7(3)(a)
EXCEPTION: A ramp with a slope no greater than 1:6 for a run not to exceed 2 ft (610 mm) may be used as part of an accessible route to an entrance....
-
4.1.7(2)(a)
EXCEPTION: A ramp with a slope no greater than 1:6 for a run not to exceed 2 ft (610 mm) may be used as part of an accessible route at an entrance....
-
T503.5 Exterior Illumination for Boarding and Alighting Areas
Exterior lighting shall be provided to illuminate walking surfaces of boarding and alighting areas when the doors of non-rail vehicles are open....
-
Alterations/ Historic Preservation
Steeper slopes are allowed for short ramps where a 1:12 slope is not technically feasible....
-
1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with 1003.3. Advisory 1003.3 Clearances....
-
1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with 1003.3. Advisory 1003.3 Clearances....
-
§ 38.83(c)(8) Handrails
grasp them from outside the vehicle while starting to board, and to continue to use them throughout the boarding process, and shall have the top between 30 inches and 38 inches above the ramp...
-
1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with 1003.3. Advisory 1003.3 Clearances....
- The Corada Shop
-
1. Transfer Surface
[See subsections ...]
-
(3) the City's curb ramp design standard
(3) the City's curb ramp design standard utilized between 1994 and 2004 pursuant to which it constructed curb ramps with a V inch lip at the base in violation of federal disability access...
-
11B-809.9.3 Removable base cabinets
Knee and toe space complying with Section 11B-306 shall be provided at sinks and work surfaces required to comply with Section 11B-809.9.4....
-
11B-1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with Section 11B-1003.3. [2010 ADAS] Advisory 1003.3 Clearances. ...
-
11B-1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with Section 11B-1003.3. [2010 ADAS] Advisory 1003.3 Clearances....
-
11B-1003.3 Clearances
Clearances at boat slips and on boarding piers at boat launch ramps shall comply with Section 11B-1003.3. Advisory 11B-1003.3 Clearances....
-
5.1.4 Transfer Surface Height Measurement for M301 and M302
5.1.4 Transfer Surface Height Measurement for M301 and M302 The Committee recommends capturing the transfer surface height at the highest point of the seat in an uncompressed state, inclusive...
-
5.4.4.1 Transfer Support Distance from Transfer Surface for Stretchers
5.4.4.1 Transfer Support Distance from Transfer Surface for Stretchers....
-
§ 38.95(c)(6) Attachment
(6) Attachment—.
-
M302.2.3 Size
Transfer surfaces shall be 21 inches (610 mm) wide minimum and 17 inches (430 mm) deep minimum....
-
Step 3: Apply the Accessibility Provisions
This step involves looking at FSTAG, sections 7.4.1 through 7.4.8, which contain the technical requirements for trail grade, cross slope, resting interval, surface, clear tread width, passing...
-
4.3.7 Slope
An accessible route with a running slope greater than 1:20 is a ramp and shall comply with 4.8. Nowhere shall the cross slope of an accessible route exceed 1:50....
-
4.3.7 SLOPE
An accessible route with a running slope greater than 1:20 is a ramp and shall comply with 4.8. Nowhere shall the cross slope of an accessible route exceed 1:50....
-
6.8.2 Grade and cross slope
Where the surface is paved or is elevated above the natural ground, the surface shall not be steeper than 1:48 (2 percent) in any direction....