, the following shall apply: Where the occupant load is less than 10, except Group I, Division 1 occupancies, or where the occupant load is greater than 10 and it is determined that compliance...
Search Results "Compliance Agreement"
-
1133B.2.3.2
-
A4.5.1 General
A research project sponsored by the Architectural and Transportation Barriers Compliance Board (Access Board) conducted tests with persons with disabilities and concluded that a higher coefficient...
-
Choice of Option One for Defining ‘‘Designed and Constructed for First Occupancy’’ (Preamble, Section-by-Section Analysis)
First, section 303(a) requires compliance with accessibility standards set forth, or incorporated by reference in, regulations to be issued by the Department of Justice....
-
Choice of Option One for Defining "Designed and Constructed for First Occupancy'' (Section-By-Section Analysis and Response to Comments)
First, section 303(a) requires compliance with accessibility standards set forth, or incorporated by reference in, regulations to be issued by the Department of Justice....
- Florestone 35-62H Barrier-Free Shower
- Bradley Grab Bars 1 1/2" with Concealed Mounting 812
- TownSteel "V" Rose Tubular Lockset
- TownSteel "L" Rose Tubular Lockset
- Allegion Falcon SC80 Series Surface Mounted Door Control
- American Safety Tread Co., Inc. Type T-24 Contrasting Stripe
- IPS Corporation Truebro® Basin Guard® Undersink Protective Enclosures
- TownSteel ED1100F Grade 1 Fire Rim Device
- Advent Sebring Wall Sconce with Emergency Battery Back-Up
- Willoughby Industries ASUW-1314-HEU-FA-BS Contoured High Efficiency Urinal with Washout Flush
- Norton Surface Mounted 7100SZ Series SafeZone® Electromechanical Closer
- TownSteel ED6500 Narrow Stile Panic Rim Device
- TownSteel "H" Rose Tubular Lockset
- TownSteel "B" Rose Tubular Lockset
- TownSteel "F" Rose Tubular Lockset
- Corbin Russwin Inc. DC5000 Series Cam Action Door Closer
- TownSteel "S" Rose Tubular Lockset
- TownSteel "LS" Rose Tubular Lockset
- TownSteel "C" Rose Tubular Lockset
-
11B-809.10.2 Number of complying bathing rooms and fixtures
Where two or more bathrooms are provided, when a bathtub is installed in the first bathroom in compliance with Section 11B-809.10.5 and a shower compartment is provided in a subsequent bathroom...