The site selection and layout of the accessible route should be considered alongside the selection of the play equipment....
Search Results "Strength Equipment"
-
Summary: What Every Playground Owner Should Know About the Accessibility of Their Playground Surfaces
-
3.7 Training Costs
training programs and reinforce this training on a regular basis to ensure that staff members know how to turn on the captions, to operate the devices, and are able to assist patrons in the equipment’s...
-
Using the Conditions for an Exception in FSORAG
If the work could be done using small equipment, the condition for an exception wouldn't apply. Terminology Tip What's practicable?...
- Bobrick Swing-Up Grab Bar B-4998.99
- Just Manufacturing Backsplash Mounted Sink Faucet with Soapdish and Tube Spout
- Just Manufacturing Ledgemount Non-Swivel Gooseneck Concealed Mixing Faucet
- Just Manufacturing Classroom Deck Mounted Gooseneck Single Supply Gooseneck Faucet
- Just Manufacturing Classroom Concealed Top Mounted Remote Single Handle Restricted Swing Faucet
-
4. Assess During the Planning, Installation and Maintenance Phases
Once the playground surface is installed, an on-site inspection of the surface system should be conducted along the accessible routes, at the clear ground spaces for entry/egress of equipment...
- Ampetronic ILD122 Professional Rack Mountable Audio Induction Loop Driver Hearing System
- Haws AXION® MSR Barrier Free Recessed Shower and Eye/Face Wash 8356WCC
- Ampetronic ILD300 Professional Rack Mountable Audio Induction Loop Driver Hearing System
- Ampetronic ILD500G Professional Rack Mountable Audio Induction Loop Driver Hearing System
- Wilkinson Hi-Rise Trash Chute
- Besam SL500 Surface Mount Automatic Sliding Door
- Corbin Russwin Inc. ED7000 Series Narrow Stile Crossbar Exit Device
- Hadrian Inc. Solid Plastic Toilet Partitions
- Horton ProSlide® Series 2003 Belt Drive System
- Sunlighten Community Solocarbon® Far Infrared Sauna
-
2.8 Aircraft and Air Carrier Facility Accessibility.
Lifts, ramps, or other suitable devices not normally used for the movement of freight must be available, if the terminals at such airports are not equipped with passenger loading bridges...
-
G. Reporting
Any new equipment necessary to ensure compliance with the terms of this Agreement shall be acquired and ready for use as soon as practicable but no later than six (6) months after the acquisition...
-
Chapter 4: Hardware (Section-by-Section Analysis)
For these reasons, the proposed rule is not expected to impose material new costs on manufacturers of telecommunications equipment and customer premises equipment....