The IP Strobe is easy to set up and works with any IP based phone system or hosted solution. ...
Search Results "AGT: Automated Guideway Transit System"
Commonly Searched Documents
- TelCom Cyberdata IP Phone Strobe for VoIP Phone Systems 011087 Visual Alerting Device
-
Section 37.155 Factors in Decision To Grant an Undue Financial Burden Waiver
While the regulation calls for a trip-by-trip determination of eligibility, this provision recognizes that this is not possible for some systems, particularly the large systems....
-
Review Process
Review Process: The following is a brief overview of the review process that FHWA will employ, using the Review Guide as a tool, for determining the status of a State’s ADA transition...
-
R305.1.4 Size
At curb ramps and blended transitions, detectable warning surfaces shall extend the full width of the ramp run (excluding any flared sides), blended transition, or turning space....
- BTX Intelligent Fashion Tumo Programming Reverse Motor Direction
- SafePath Courtedge™ Reducer Ramps
-
Equivalent Facilitation: ADA Standard Section 103
Section 103 of the ADA Standards covers information on equivalent facilitation in the 2010 ADA Standards.
-
§8.25(c)(3)
(3) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time of the transition plan is longer than one year, identify steps that will...
- Panda S.51 All Aluminum Folding Window System
- TS.60 Bi- Fold Thermally Broken System Installation
- WoodCarpet Ground Surface System: WoodCarpet Mat Installation Video
-
Atlantis Rail Systems Cable Railing How To Instructional Video
Requires the Registered User plan or above. Login!
- Panda S.66 Solid Wood Folding Door System
- Panda S.51 All Aluminum Folding Door System
-
§35.150(d)(1)
to facilities will be undertaken to achieve program accessibility, a public entity that employs 50 or more persons shall develop, within six months of the effective date of this part, a transition...
-
§ 35.150(d)(1)
structural changes to facilities will be undertaken to achieve program accessibility, a public entity that employs 50 or more persons shall develop, within six months of January 26, 1992, a transition...
-
§8.24(d)(3)
(3) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time period of the transition plan is longer than one year, identify steps that...
-
§8.21(c)(4)(iii)
(iii) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time period of the transition plan is longer than one year, identify steps that...
-
§35.150(d)(3)(iii)
(iii) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time period of the transition plan is longer than one year, identify steps that...
-
§ 35.150(d)(3)(iii)
(iii) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time period of the transition plan is longer than one year, identify steps that...
-
Installation
Installation Surface materials/systems were installed by both contractors and the playground owners’ maintenance staff. ...
-
Statement of the Department of Justice on Application of the Integration Mandate of Title II of the Americans with Disabilities Act and Olmstead v. L.C. to State and Local Governments' Employment Service Systems for Individuals with Disabilities
Zimring, 527 U.S. 581 (1999), regarding the integration mandate of Title II of the Americans with Disabilities Act (ADA), some state and local service systems have begun to provide a greater...
-
218 and 810 Transportation Facilities
The 2010 Standards at sections 218, 810.5, 705.1, and 705.2 only require detectable warnings at transit platform edges....
-
Side Reach [4.2.6]
Further guidance on reach heights according to depth is available from specifications for automated teller machines in ADAAG 4.34 (see page 125)....
