The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground or station platform level, shall be sufficient when raised or closed, or a supplementary...
Search Results "Circular Ramp"
Commonly Searched Documents
-
§ 38.125(b)(5) Platform barriers
-
§ 38.23(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
-
11B-206.3 Location
Elements such as ramps, elevators, or other circulation devices, fare vending or other ticketing areas, and fare collection areas shall be placed to minimize the distance which wheelchair...
-
§ 38.159(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
-
§ 38.95(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground or station platform level, shall be sufficient when raised or closed, or a supplementary...
-
11B-206.3 Location
Elements such as ramps, elevators, or other circulation devices, fare vending or other ticketing areas, and fare collection areas shall be placed to minimize the distance which wheelchair...
- Rebuilding Together Kent County - Chestertown, MD
-
(B) Staircase replacements are alterations that affect or could affect the usability of a public transportation facility or part thereof.
NYCT, in its comments to the docket for FTA’s proposed ADA circular, asserted that an alteration to an existing facility must be done “in a way that affects or could affect the usability...
-
1. Question: What is the minimum width needed for a non-level boarding railroad passenger station platform to meet the accessibility requirements of the Americans with Disabilities Act (ADA)?
lift platform has been made to accommodate various lifting mechanism designs.1 The lifting platform cannot be more than 3 inches above the platform in the down position with a connecting ramp...
-
11. Fixing my business will be too expensive; therefore, I am unable to do anything to reduce my risk.
Faded, chipped, damaged, or deteriorated paint in otherwise fully compliant parking spaces and passenger access aisles; and 7) The presence or condition of detectable warning surfaces on ramps...
-
Test Courses & Surfaces
This “access route” was 574.2 ft (175.0 m) in length, and included two 137 ft (41.8 m) sections with grades of 4% to 5% (one uphill, one downhill), and two 30-foot (9.1 m) ramps with grades...
- The Land of Color LRV Guru™ App
-
Changes in Level and Horizontal Gaps
The referenced vehicle guidelines (like those of the proposed rule) permit the use of mini high platforms, car-borne or platform-mounted lifts, ramps or bridge plates, or manually deployed...
-
Reasonable Modification
Examples of Reasonable Modifications Granting a zoning variance to allow a ramp to be built inside a set-back....
-
A. Introduction
Accessibility is not just physical access, such as adding a ramp where steps exist....
-
11B-221.2.3.2 Vertical dispersion
Points of entry to bleacher seating may include, but are not limited to, cross aisles, concourses, vomitories, and entrance ramps and stairs....
-
Q2.) What are the types of “field conditions” that were anticipated where the advisory says “tolerances recognized by this provision include those for field conditions”?
And a concrete finisher clearly cannot guarantee that the slope of a concrete curb ramp will be consistently 8.33% across its entire surface. ...
-
Other Services and Accommodations
Where level-entry boarding is not available, there must be ramps or mechanical lifts to service most aircraft with 19 or more seats at U.S. airports with over 10,000 annual enplanements...
-
When Transfer Systems Are Used
systems may be used to connect up to 25 percent of the elevated play components and the rest of the elevated play components required to be on an accessible route must be connected by a ramp...
-
Circulation Path
The components of a circulation path include but are not limited to rooms, corridors, doors, stairs, smokeproof enclosures, horizontal exits, ramps, exit passageways, escalators, moving...
-
Current industry standard practices resulting from this project
Tile Council of North America (TCNA) The TCNA participated in this project and developed guidelines for ramp slopes, changes in level, flatness and lippage....
-
11B-221.2.3.2 Vertical dispersion
Points of entry to bleacher seating may include, but are not limited to, cross aisles, concourses, vomitories, and entrance ramps and stairs....
-
11B-221.2.3.2 Vertical dispersion
Points of entry to bleacher seating may include, but are not limited to, cross aisles, concourses, vomitories, and entrance ramps and stairs....
-
Section 36.304 Removal of Barriers (Preamble, Section-by-Section Analysis)
Ramping a single step, however, will likely be readily achievable, and ramping several steps will in many circumstances also be readily achievable....