Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply with Section...
Search Results "Maximum Extent Practicable"
-
11B-222.1 General
-
F222.1 General
Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply with...
-
222.1 General
Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply with...
-
222.1 General
222.1 General. Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply...
-
Alterations
In alterations, the minimum number is based on the total number of spaces altered or added to a lot. Recommendation: Where a lot is not fully altered, it is recommended that the...
-
4.17.3* Size and Arrangement
The size and arrangement of the standard toilet stall shall comply with Fig. 30(a), Standard Stall. Standard toilet stalls with a minimum depth of 56 in (1420 mm) (see Fig. 30(a))...
-
11B-222.1 General
Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply with Section...
-
11B-222.1 General
Where dressing rooms, fitting rooms, or locker rooms are provided, at least 5 percent, but no fewer than one, of each type of use in each cluster provided shall comply with Section...
-
Conclusion
path of travel) readily accessible to and usable by individuals with disabilities, including individuals who use wheelchairs, without regard to cost or cost disproportionality, to the maximum...
-
3 - Best practices for pre - construction meetings
3 - Best practices for pre - construction meetings Pre - construction meetings provide another commonly used technique to communicate the required needs of the project....
-
Sec.36.403(a) General
An alteration that affects or could affect the usability of or access to an area of a facility that contains a primary function shall be made so as to ensure that, to the maximum extent...
-
3. New Construction vs. Alterations
In these cases, the curb ramps installed must meet the accessibility requirements of the ADA to the maximum extent feasible.10 Scoping requirements in the ADA Standards establish limitations...
-
15. What are some other best practices for child welfare agencies and courts?
What are some other best practices for child welfare agencies and courts?...
-
Maximum side reach ranges. (Section-by-Section Analysis)
The 2004 ADAAG includes a change in the maximum height of a side reach range from 54 inches in the current ADA Standards, to 48 inches in the 2004 ADAAG. ...
-
Accessible Practice Putting Greens, Practice Teeing Grounds, and Teeing Stations at Driving Ranges
Accessible Practice Putting Greens, Practice Teeing Grounds, and Teeing Stations at Driving Ranges....
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
-
11B-1002.2 Accessible routes
In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 _|Slope|_ is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum...
-
11B-1002.2 Accessible routes
In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 _|Slope|_ is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum...
-
11B-1002.2 Accessible routes
In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum...
-
11B-232.2.1.4 Technically infeasible
Where it is technically infeasible to locate a substitute cell within the same prison site in compliance with Section 11B-232.2.1.3, a substitute cell shall be provided at another...
-
11B-232.2.1.4 Technically infeasible
Where it is technically infeasible to locate a substitute cell within the same prison site in compliance with Section 11B-232.2.1.3, a substitute cell shall be provided at another...
-
Section 36.302 Modifications in Policies, Practices, or Procedures (Section-by-Section Analysis)
[See subsections ...]