Cost Estimates for Barrier Removal Click here to view/download the pdf version (10 KB) Staff at Evan Terry Associates and a Birmingham general contractor developed the original estimates...
Search Results "Cost Estimate"
-
Cost Estimates for Barrier Removal
-
Costs and Personnel Time for EWF Installation
The following summary of costs and time estimates is not meant to be definitive. Markup for contractors or other overhead and profits is not included....
-
4.2.4. Single-Auditorium Movie Theater Unit Costs Including Sony’s Technology
This sensitivity analysis observes the impact to the cost estimation if Sony’s technology is included in the average unit cost estimates for Single-Auditorium movie theaters. ...
-
Summary of Costs and Benefits
We determined the final rule would not result in additional costs for camping facilities and picnic facilities....
-
3.2.2.4. Summary of Baselines
The primary analysis uses the Medium Accessibility baseline in the calculation of the estimated costs. ...
-
4.2.3. Alternate Medium Accessibility Baseline
The 2015 NATO Accessibility survey provides information supporting the Department’s estimate of the current number of auditoriums already equipped to provide closed movie captioning or audio...
-
4.2.2. High Accessibility Baseline
The total costs over the 15-year analysis period under the High Accessibility baseline are $68.8 million when discounted at 7 percent, which is 22 percent lower than the total costs estimated...
-
3.2.2.1. Low Accessibility Baseline
The Low Accessibility baseline is the most conservative of the three baselines developed for the cost estimation. ...
-
3.8 Maintenance and Administrative Costs
The cost estimation also quantifies any additional maintenance and administrative costs associated with the rulemaking. ...
-
4.2.1. Low Accessibility Baseline
The primary analysis estimates the costs to movie theaters using the Medium Accessibility baseline. ...
-
4.2.7. Maintenance and Administrative Costs
The costs covered by the maintenance and administrative costs in the Final RA are discussed in Section 4.2.7. ...
-
3.2.2.3. High Accessibility Baseline
**Based on estimated total number of indoor digital auditoriums (39,338) in compliance year (2017) The High Accessibility baseline assumes that 92 percent of auditoriums are equipped...
-
3.2.2.2. Medium Accessibility Baseline
The Medium Accessibility baseline is used in the cost estimation for the primary analysis presented in Section 4.1. ...
-
Costs
routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed or altered or beach nourishment project is undertaken We estimate...
-
3.4. Unit Costs
these companies.23 In the Initial RA, the Department estimated the hardware and device costs by averaging the retail prices for the systems provided by Doremi Captiview and USL. ...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
3.4.5. Unit Costs by Venue
The Final RA estimates the average unit costs of the hardware and the devices based on the retail prices of all currently-available equipment from the three manufacturers....
-
11. Fixing my business will be too expensive; therefore, I am unable to do anything to reduce my risk.
Finally, there are tax credits available to you to offset the cost of creating disability access such as: The California Business Portal "Go-Biz" http://businessportal.ca.gov/....
-
2.1.1. Parameters
This time frame is the Department’s current best estimate of the impact of this rule before it is replaced by a revised regulation. ...
-
8.1. Annual Costs
Table 8-1 : Annual Costs Over Period of Analysis in Primary Analysis, Discounted at 7 Percent ($ millions) Primary Analysis Total Costs 2016...
-
6.3. Auditoriums Exhibiting Analog Movies
Cost Estimation The cost estimation for auditoriums exhibiting analog movies is presented in Table 6-7. ...
-
6.1. Compliance Date
In the cost estimation, the compliance date impacts the years in which movie theaters purchase the necessary equipment. ...
-
4.2.5. Device Replacement