Using this baseline, the total incremental costs of the rule are calculated for 15 years at both 7-percent and 3-percent discount rates, discounted to 2015....
Search Results "Incremental Cost"
Commonly Searched Documents
-
2.2. Total Costs
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
SUMMARY OF PRELIMINARY REGULATORY ANALYSIS
To estimate likely incremental compliance costs attributable to the proposed rule, the Preliminary RIA estimates, quantifies, and monetizes costs in the following broad areas: (1) costs...
-
Exception 2
in compliance with the accessibility requirements of the immediately preceding edition of the California Building Code, it shall not be required to retrofit such elements to reflect the incremental...
-
Costs Not Monetized in the Formal Analysis
Entities covered by the final rules may choose to delay otherwise desired alterations to their facilities due to the increased incremental costs imposed by compliance with the new requirements...
-
Costs Not Monetized in the Formal Analysis
Entities covered by the final rules may choose to delay otherwise desired alterations to their facilities due to the increased incremental costs imposed by compliance with the new requirements...
-
Final Regulatory Impact Analysis
The Final RIA embodies a comprehensive benefit-cost analysis of the final rules for both title II and title III and assesses the incremental benefits and costs of the 2010 Standards relative...
-
C. Costs and Benefits
For this reason, the Board cannot estimate the incremental monetary or quantitative impacts of the final rule....
-
5. ADJUSTED CONSTRUCTION COST
ADJUSTED CONSTRUCTION COST...
-
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis)
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis) In the NPRM, the Department requested comment on various cost...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
Summary of Costs and Benefits
We determined the final rule would not result in additional costs for camping facilities and picnic facilities....
-
Cost Estimates for Barrier Removal
Basic Costs $0.00 Cost Estimate is expected to be zero. $1.00 Unit Cost Estimate is too dependent on existing conditions to set a generic estimate....
-
Other Cost Issues
Other Cost Issues An employer may not claim undue hardship simply because the cost of an accommodation is high in relation to an employee's wage or salary....
-
4.2.7. Maintenance and Administrative Costs
The costs covered by the maintenance and administrative costs in the Final RA are discussed in Section 4.2.7. ...
-
3.8 Maintenance and Administrative Costs
The cost estimation also quantifies any additional maintenance and administrative costs associated with the rulemaking. ...
-
§ 36.403(a)(2)
of public accommodation or commercial facility in accordance with the specifications in the 1991 Standards, the private entity is not required to retrofit such elements to reflect the incremental...
-
Adjusted Construction Cost
DEFINITION NOTES Adjusted Construction Cost New and explicit definition to provide specific costs included in the adjusted...
-
Alterations Affecting Primary Function Areas: ADA Standard Section 202.4
Section 202.4 covers the most current ADA Standards for alterations affecting primary function area.
-
§ 37.43(e)(2)(iv)
(iv) Costs associated with relocating an inaccessible drinking fountain....
-
§ 37.43(e)(2)
(2) Costs that may be counted as expenditures required to provide an accessible path of travel include:...
-
4.1 Path of Travel Upgrades Not Required
Retrofit to reflect incremental changes in the code solely because of an alteration to an area served by the following elements shall not be required: • A primary entrance to the building...
-
D. Costs to Impacted Small Entities
costs) of the Final RA....