Aggregate....
Search Results "Aggregate"
Commonly Searched Documents
-
Aggregate
-
Installation of Aggregate Surfaces at Bradford Woods
Installation of Aggregate Surfaces at Bradford Woods The installation of the aggregate surfaces at Bradford Woods conformed to the following protocol: Prior to installing the crushed...
-
Qualitative and Observational Analysis by Surface Type
In the Midwest, the primary aggregate material made available at quarries for distribution is Limestone; therefore, Limestone was the aggregate component used in the aggregate only trail...
-
Summary of Results
Summary of Results The qualitative and quantitative data show that the trail segments constructed of ¾ inch minus limestone aggregate, Klingstone 400 soil stabilizer, and StaLok stabilizer...
-
Recommendations for Future Research
Recommendations for Future Research The evaluation of the 11 trail surface materials in this study has provided valuable information in regards to soil stabilizers and natural aggregate...
-
Technical Memorandum TM 2012-07 Press Boxes
07 Press Boxes Effective Date: January 22, 2013 2012 TAS Reference: 206.2.7, Exception 1 and 2 The following clarifications are provided to address references to the terms "aggregate...
-
23. Please indicate the aggregate type used and the depth at which it can be found
Please indicate the aggregate type used and the depth at which it can be found (choose all that apply): Aggregate Type Depth 0”- 4” Depth 5”- 8”...
-
Press Boxes: ADA Standard Section 206.2.7
Section 206.2.7 covers scoping requirements in the most current ADA Standards for accessible routes to press boxes.
-
11B-206.2.7 Press boxes
Exceptions: An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is...
-
Mezzanine
An intermediate level or levels between the floor and ceiling of any story with an aggregate floor area of not more than one-third of the area of the room or space in which the level or...
-
MEZZANINE
[DSA-AC] An intermediate level or levels between the floor and ceiling of any story with an aggregate floor area of not more than one-third of the area of the room or space in which the...
-
Selection of Trail Surface Materials
Those trail surface materials that were similar products were listed together within each of five major categories: Constructed soil/aggregate surfaces (e.g. crushed aggregate or...
-
Appendix A National Trails Surface Study Participating Stabilizer Companies
Soil Type Preference Aggregate Type Specs Depth of Soil and/or Aggregate Mix Klingstone 400 Klingstone Inc. ...
-
11B-206.2.7 Press boxes
An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is 500 square feet (...
-
F206.2.7 Press Boxes
An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is 500 square feet (...
-
206.2.7 Press Boxes
An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is 500 square feet (...
-
11B-206.2.7 Press boxes
An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is 500 square feet (...
-
11B-206.2.7 Press boxes
Exceptions: An accessible route shall not be required to press boxes in bleachers that have points of entry at only one level provided that the aggregate area of all press boxes is...
-
Selection of Methodology
(type of management agency, park location, trail name, age of trail, length of trail, traffic on trail, and similar data) SECTION #2 Trail surface composition (e.g. natural, native, aggregate...
- Organic-Lock: The Self-Healing Organic Binder
-
A4.8.4 Landings
Level landings are essential toward maintaining an aggregate slope that complies with these guidelines....
-
Unfunded Mandates Reform Act
Unfunded Mandates Reform Act This final rule does not include any Federal mandate that may result in the expenditure by state, local, and tribal governments, in the aggregate, or by the...
-
Soil Stabilizer
A product that is applied either topically, or mixed-in that acts as a binding agent to either native soils or an additional type of aggregate....
-
206.2.7 Press Boxes
Where a facility contains multiple assembly areas, the aggregate area of the press boxes in each assembly area is to be calculated separately....