Features: Made of durable, hand-painted pre-cast concrete Includes steps, handrails and handholds 8” step increments Attaches to 48” deck height Rich texture enhances the sensory...
Search Results "Pre-Construction Meeting"
Commonly Searched Documents
- PlayLSI Tree Stump Transfer Module
-
2.4
respect to any of Cinemark's Existing Theaters, any of Cinemark's Modified Theaters that are modified in accordance with this Consent Order, and any of Cinemark's Designed Theaters or Future Construction...
-
EXHIBIT C Certification of ADA Compliance
I, [insert name], in my capacity as a Licensed Architect or Construction/Project Manager acting on behalf of QuikTrip Corporation pursuant to a certain Consent Decree executed by the parties...
-
11B-224.8.2 More than 50-bed facilities
ETA Editor's Note The following Access Board Note was taken from ADA Title II §35.151(e) New Construction and Alterations; Social Service Center Establishments, and ADA Title III §36.406...
-
Attachment B
City of Waukegan, Waukegan Illinois Grievance Procedure under The Americans with Disabilities Act This Grievance Procedure is established to meet the requirements of the Americans...
-
Attachment C: HUMBOLDT COUNTY, CA
Grievance Procedure under The Americans with Disabilities Act
This Grievance Procedure is established to meet the requirements of the Americans with Disabilities Act of 1990. ...
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction. ...
-
238.2.2 Putting Greens
Putting greens shall be designed and constructed so that a golf car can enter and exit the putting green....
-
202.3.2 Extent of Application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction....
-
§ 35.151(i)(2)
(2) Newly constructed or altered street level pedestrian walkways must contain curb ramps at intersections to streets, roads, or highways....
-
§ 36.406(a)(4)
(4) For the purposes of this section, "start of physical construction or alterations" does not mean ceremonial groundbreaking or razing of structures prior to site preparation....
-
Scoping
Scoping—Specifications of where, when, and how much of constructed features detailed in the technical requirements must be met in order to be in compliance with the guidelines....
-
R202.2 Added Elements
Where elements are added to existing facilities, the added elements shall comply with the applicable requirements for new construction....
-
6.2 Where Required
Beach access routes shall be provided in a number complying with 6.3 where any of the following facilities to serve the beach are constructed or altered: ...
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction....
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction....
-
§ 36.303(g)(9)(iii)
(iii) Turn on open movie captions if the movie theater is relying on open movie captioning to meet the requirements of paragraph (g)(3) of this section; and...
-
C1-f
If the slope of part of the accessible route is more than 1:20, does it meet the following requirements for an accessible ramp? Yes No...
-
§8.10(c)(7)
(7) Selection and financial support for training, including apprenticeship, professional meetings, conferences, and other related activities, and selection for leaves of absence for training...
-
B7
If there is a curb between the access aisle and the accessible route to the building, is there a curb ramp that meets the following requirements: [ADA Standards § 4.7] Yes No...
-
§ 36.303(g)(9)(iii)
(iii) Turn on open movie captions if the movie theater is relying on open movie captioning to meet the requirements of paragraph (g)(3) of this section; and...
-
7.4.11.3 Reach Ranges
If materials need to be obtained from or manipulated on a sign or kiosk, the sign or kiosk shall be designed to meet the reach ranges in section 308 of the ABAAS. ...
-
A4.10.7 Door and Signal Timing for Hall Calls
This paragraph allows variation in the location of call buttons, advance time for warning signals, and the door-holding period used to meet the time requirement....
-
3.5.3 Signs in General
If materials need to be obtained from or manipulated on a sign or kiosk, the sign or kiosk shall be designed to meet the reach ranges in section 308 of the ABAAS....