Where gates or barriers are constructed to control access to beach access routes, gates and barriers shall comply with 6.14....
Search Results "New Construction"
Commonly Searched Documents
-
6.14 Gates and Barriers
-
Condition, Manner, or Duration
terms ‘‘condition’’ ‘‘manner,’’ or ‘‘duration’’ should at all times take into account the principles in § 35.108(d)(1) and § 36.105(d)(1), respectively, which referred to the rules of construction...
-
Q9: Pavement Preservation Treatment Types
A9: New treatments are always being developed and the best practice is for the City or other local public entity conducting the work, the State transportation agency, and FHWA to work together...
-
502.3.7 Actions (Section-by-Section Analysis)
While this requirement is new to the 508 Standards, it represents widespread industry practice. It is also already a feature provided by software designed to be accessible....
-
§ 37.3 Commuter authority
means any state, local, regional authority, corporation, or other entity established for purposes of providing commuter rail transportation (including, but not necessarily limited to, the New...
-
§ 38.83(a)(2) Exception
Where each new vehicle is compatible with a single platform-mounted access system or device, additional systems or devices are not required for each vehicle provided that the single device...
- Kawneer North America 190/350/500 Standard Entrances
-
224.5 Dispersion
ETA Editor’s Note: This Access Board note was taken from 36.406(c)Standards for New Construction and Alterations; Places of Lodging. ...
-
III-7.2100 Equivalent facilitation
For instance -- 1) In altered areas, elevator car dimensions can be smaller than the standards would mandate for new construction (§4.1.6(3)(c)); 2) Rather than install a text telephone...
-
12145(a)(2)
(2) the unavailability from any qualified manufacturer of hydraulic, electromechanical, or other lifts for such new buses;...
-
E103.4 Voice Over Internet Protocol (VoIP) (Section-by-Section Analysis)
The term “Voice over Internet Protocol (VoIP)” is new and is defined consistent with current FCC regulations....
-
DOT Response
Like the NPRM, the final rule applies to new construction and alterations and does not require retrofitting....
-
ADMINISTRATIVE AUTHORITY
[DSA-AC] A governmental agency that adopts or enforces regulations and guidelines for the design, construction, or alteration of buildings and facilities....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
4.3.11.1(4)
(4) A vestibule located immediately adjacent to an exit enclosure and constructed to the same fire-resistive standards as required for corridors and openings....
-
§100.205(e)(2)
(2) The following also qualify as HUD-recognized safe harbors for compliance with the Fair Housing Act design and construction requirements:...
-
13.14 Post-1993 Franchised Hotel
13.14 “Post-1993 Franchised Hotel” means a Franchised Hotel constructed for first occupancy after January 26, 1993....
-
13.17 Post-1993 Owned Hotel
13.17 “Post-1993 Owned Hotel” means an Owned Hotel constructed for first occupancy after January 26, 1993....
-
13.16 Post-1993 Managed Hotel
13.16 “Post-1993 Managed Hotel” means a Managed Hotel constructed for first occupancy after January 26, 1993....
-
§ 35.151(c)(4)
(4) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation do not commence physical construction or alterations....
-
EXHIBIT C Certification of ADA Compliance
I, [insert name], in my capacity as a Licensed Architect or Construction/Project Manager acting on behalf of QuikTrip Corporation pursuant to a certain Consent Decree executed by the parties...
-
211 Drinking Fountains
1991 Standards for Accessible Design 2010 Standards for Accessible Design What’s New/Different 4.1.3(10)(a) Where...
-
209 Passenger Loading Zones
1991 Standards for Accessible Design 2010 Standards for Accessible Design What’s New/Different 4.1.2(5)(c) If passenger...