All plans and specifications for the construction of or for the substantial renovation or modification of a building or facility must be submitted to the department for review and approval...
Search Results "Construction Cost"
-
Sec. 469.101. Submission for Review and Approval Required.
-
7.4.11 Trailhead Signs
Where new trailhead information signs are provided at trailheads on newly constructed or altered trails, they shall comply with 7.4.11....
-
6.14 Gates and Barriers
Where gates or barriers are constructed to control access to beach access routes, gates and barriers shall comply with 6.14....
-
III-7.4100 General
This section addresses exterior features such as parking, portable toilets, and exterior signage in new construction....
-
Q7: Curb Ramp for a Sidewalk that is Not Made of Concrete or Asphalt
A "prepared surface for pedestrian use" can be constructed out of numerous materials, including concrete, asphalt, compacted soil, decomposed granite, and other materials. ...
-
J. Valet Parking and New Parking Garage
Valet Parking and New Parking Garage (1) Defendants are currently in the process of constructing a new parking garage located on South Royal Street to the immediate south of the Hotel...
-
Adaptability
Adaptability Toilet rooms designed for use by a single occupant of a specific space, can be designed to be "adaptable" so that accessible elements can be installed when needed after construction...
-
VIII. Existing Facilities: Alternatives to Barrier Removal
Extra charges may not be imposed on individuals with disabilities to cover the costs of measures used as alternatives to barrier removal....
-
Electronic instruments
Their disadvantages include a high initial cost and training needed for their proper use or the employment of a testing agency....
-
Vanpool
Drivers are themselves commuters who are either volunteers who receive no compensation for their efforts or persons who are reimbursed by other riders for the vehicle, operating, and driving costs...
-
ADMINISTRATIVE AUTHORITY
[DSA-AC] A governmental agency that adopts or enforces regulations and guidelines for the design, construction, or alteration of buildings and facilities....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
4.3.11.1(4)
(4) A vestibule located immediately adjacent to an exit enclosure and constructed to the same fire-resistive standards as required for corridors and openings....
-
§100.205(e)(2)
(2) The following also qualify as HUD-recognized safe harbors for compliance with the Fair Housing Act design and construction requirements:...
-
13.14 Post-1993 Franchised Hotel
13.14 “Post-1993 Franchised Hotel” means a Franchised Hotel constructed for first occupancy after January 26, 1993....
-
13.17 Post-1993 Owned Hotel
13.17 “Post-1993 Owned Hotel” means an Owned Hotel constructed for first occupancy after January 26, 1993....
-
13.16 Post-1993 Managed Hotel
13.16 “Post-1993 Managed Hotel” means a Managed Hotel constructed for first occupancy after January 26, 1993....
-
§ 35.151(c)(4)
(4) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation do not commence physical construction or alterations....
- Kee Safety Inc. ADA Safety Handrail Components
- DORMA 8000 Series Exit Device
-
Condition, Manner, or Duration
terms ‘‘condition’’ ‘‘manner,’’ or ‘‘duration’’ should at all times take into account the principles in § 35.108(d)(1) and § 36.105(d)(1), respectively, which referred to the rules of construction...
- Face® Dipstick® Floor Profiler (Measuring F-Numbers - Concrete Flatness & Levelness Measurement)
-
5. Compare Surface Options
Some agencies may have more capital dollars at the front of the project for a surface system that costs a little more but requires less maintenance....