This law and the appropriate regulations should be consulted before proceeding with the design and construction of residential housing....
Search Results "Pervious Construction"
Commonly Searched Documents
-
F224.1 General
-
Protruding Objects [1016.9]
Constructed elements, such as signs on ORARs, resting intervals, and passing spaces, must comply with the technical requirements for protruding objects in section 307.2 of the ABA Standards...
-
704.10 Vertical exposure
Exception: Opening protectives are not required where the roof construction has a fire-resistance rating of not less than 1 hour for a minimum distance of 10 feet (3048 mm) from the adjoining...
-
§8.50(c)(3)
If a transferee of real property proposes to mortgage or otherwise encumber the real property as security for financing construction of new, or improvement of existing, facilities on the...
-
Signs
In newly constructed and altered facilities, signs that identify permanent rooms and spaces – including, but not necessarily limited to those identifying rest rooms, exits, or room numbers...
-
§104.5(c)(3)
If a transferee of real property proposes to mortgage or otherwise encumber the real property as security for financing construction of new, or improvement of existing, facilities on the...
-
1134A.5, Item 5
Doors and panels of bathtub enclosures shall be substantially constructed from approved, shatter-resistant materials. Hinged doors shall open outward....
-
1134A.6, Item 7
Doors and panels of shower enclosures shall be substantially constructed from approved, shatter-resistant materials. Hinged shower doors shall open outward....
-
Appalachian Trail Conservancy's "Backcountry Sanitation Manual"
This comprehensive manual explains the basic issues of remote area sanitation, including health, aesthetics, and regulations, but it focuses on the construction and maintenance of moldering...
-
5.1* General
In new construction, and where practicable in alterations, accessible fixed tables (or counters) shall be distributed throughout the space or facility....
-
ADA Standards for Accessible Design
adopt revised, enforceable accessibility standards called the 2010 ADA Standards for Accessible Design, which set minimum requirements—both scoping and technical—for newly designed and constructed...
-
1134A.5, Item 5
Doors and panels of bathtub enclosures shall be substantially constructed from approved, shatter-resistant materials. Hinged doors shall open outward....
-
1134A.6, Item 7
Doors and panels of shower enclosures shall be substantially constructed from approved, shatter-resistant materials. Hinged shower doors shall open outward....
-
§ 37.3 Station
restrooms, and, where a public entity providing rail transportation owns the property, concession areas, to the extent that such public entity exercises control over the selection, design, construction...
-
Trailhead Information Signs [F216.13 and 1017.10]
When a new trail information sign is provided at the trailhead on a newly constructed or altered trail designed for use by hikers or pedestrians, the sign must provide information about...
-
III-5.3000 Application of ADAAG
Department of Justice has adopted the ADA Accessibility Guidelines (ADAAG), issued by the Architectural and Transportation Barriers Compliance Board, as the standard to be applied in new construction...
-
F - number system
F - number system The F - number system, ASTM E 1155, Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers, was developed primarily to aid in the construction...
-
a) Curb Ramps
One of the goals of the Curb Ramp and Sidewalk Transition Plan is "curb ramp saturation"—that is, to construct a curb ramp compliant with its current design standards at the end of every...
-
1. Executive Summary
We are required by section 502 of the Rehabilitation Act to establish and maintain accessibility guidelines for the design, construction, and alteration of facilities covered by the Americans...
-
104 Conventions
A commenter stated that the 2010 Standards restrict the application of construction tolerances only to those few requirements that are expressed as an absolute dimension....
-
Passing Spaces [1016.4]
resting intervals overlap, the technical requirements for resting intervals apply and the slope of the surface must be no steeper than 1:48 (2 percent) in any direction when the ORAR is constructed...
-
5. Ground Level PV Systems
See Section 7 - Path of Travel Requirements and Adjusted Construction Cost for policy guidance on the adjusted construction cost for compliance with path of travel requirements. ...
-
Areas of Rescue Assistance [4.1.3(9), 4.3.11]
Other spaces, such as individual offices, can be designed and constructed according to these specifications and used as an area of rescue assistance where approved by the appropriate local...