(iv) Given the rules of construction set forth in this section, it may often be unnecessary to conduct an analysis involving most or all of the facts related to condition, manner, or duration...
Search Results "Final Regulatory Impact Analysis"
-
§ 35.108(d)(3)(iv)
-
Oven Controls
A specification that these controls be to the side of the door has been removed in the final rule as unnecessarily restrictive....
-
§ 35.151(c)(2)
(2) Facilities on which construction commences on or after [date six months after the effective date of the final rule], shall comply with the proposed standards....
-
225(e)(2) Complaint
(2) Complaint The Commission shall resolve, by final order, a complaint alleging a violation of this section within 180 days after the date such complaint is filed....
-
§ 36.601 Certification of equivalency
Certification of equivalency means a final certification that a code meets or exceeds the minimum requirements of title III of the Act for accessibility and usability of facilities covered...
-
F105.2.3 ASTM
ASTM F 1292-99 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment (see 1008.2.6.2)....
-
105.2.3 ASTM
ASTM F 1292-99 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment (see 1008.2.6.2)....
-
105.2.3 ASTM
ASTM F 1292-99 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment (see 1008.2.6.2)....
-
A. Evaluating the Physical Accessibility of Emergency Shelters
When evaluating physical accessibility in older facilities, it may be a good idea to do the analysis in two parts....
-
6. Modifications to the Functional Performance Criterion for Limited Vision
We discuss the issue in further detail in Section VI.B (Section-by-Section Analysis – Section 508 Application and Scoping - E203), Section VI.C (Section-by-Section Analysis – 255 Guidelines...
-
3.9 The Undue Hardship Limitation
If an employer has only one facility, the cost and impact of the accommodation will be considered in relation to the effect on expenses and resources of that facility....
-
§1607.5 General standards for validity studies.
For any selection procedure which is part of a selection process which has an adverse impact and which selection procedure has an adverse impact, each user should maintain and have available...
-
Is a transportation operator required to procure vehicles with lifts that have a design load of more than 600 pounds?
These are not regulatory changes or requirements but may be applicable. For more information, see http://www.highspeed-rail.org....
-
Is a transportation operator required to procure vehicles with lifts that have a design load of more than 600 pounds?
These are not regulatory changes or requirements but may be applicable. For more information, see http://www.highspeed-rail.org....
-
General Issues
The final rule has been structurally reorganized in several respects....
- AJW Architectural Products U103 33 oz. Single Cartridge ABS Liquid Soap Dispenser - Surface Mounted
-
AVAILABLE DATA DO NOT SUPPORT DEPARTING FROM THE CURRENTLY ACCEPTED STANDARD OF 19-INCH TRANSFER SURFACE HEIGHT
It goes on to state that: This measure is clinically relevant because it impacts the user’s overall sitting height, clearance under tables, clearance of foot supports above casters or...
-
c) Changes
Department of Transportation (DOT) adopted by reference the revised ADAAG as regulatory standards effective November 29, 2006, and added or modified four sections....
-
Changes
Department of Transportation (DOT) adopted by reference the revised ADAAG as regulatory standards effective November 29, 2006, and added or modified four sections....
-
§100.142(b)(2)
underwriting standards, compensation records) and information or data derived from such files and records, even if such data has been aggregated, summarized or reorganized to facilitate analysis...
-
§1630.2(j)(4)(iv)
(iv) Given the rules of construction set forth in paragraphs (j)(1)(i) through (ix) of this section, it may often be unnecessary to conduct an analysis involving most or all of these types...
-
3.3 Finding of Unreasonable Hardship:
A finding of unreasonable hardship may be made by the enforcing agency and should be based upon a detailed project-specific analysis....
-
Two-Way Communication
These requirements have been removed in the final rule because the referenced elevator safety code (ASME A17.1), as revised, adequately addresses these features or makes them unnecessary...
-
3. Emergency Transportable Housing
The final rule was effective June 6, 2014....