An alternative material, design or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the...
Search Results "Submitting Official"
Commonly Searched Documents
-
1.2.3 Alternative materials, design and methods of construction and equipment
-
6.3 Minority Reports
Access Board rules allowed individual Committee members to submit their views about this issue through a Minority Report....
-
382.9 What may foreign carriers do if they believe a provision of a foreign nation’s law prohibits compliance with a provision of this Part?
However, if a foreign government officially informs a carrier that it plans to take enforcement action (e.g., impose a civil penalty) against a carrier for failing to implement a provision...
-
The Commenters
Architectural and Transportation Barriers Compliance Board (ATBCB); the Building Officials Code Administrators International, Inc....
-
16(i)
The report shall state the number of hotels by Brand (i) that submitted requests for extensions (and their disposition), surveys, plans, and certifications, (ii) whose surveys were verified...
-
§ 37.135(f)(2)
(2) The FTA Regional Office (as listed in appendix B to this part) for all other entities required to submit a paratransit plan....
-
§27.125(a) General.
If there is reasonable cause for the responsible Departmental official to believe that there is a failure to comply with any provision of this part that cannot be corrected by informal means...
-
Rulemaking History
Final guidelines were issued in 1998, but did not include requirements for pedestrian facilities in the public right-of-way because comments submitted on the proposed and interim guidelines...
-
§27.123(b) Complaints.
any specific class of individuals to be harmed by failure to comply with this part may, personally or through a representative, file a written complaint with the responsible Departmental official...
-
§8.56(j)(1) General
The responsible civil rights official may attempt to resolve a matter through informal means at any stage of processing. A matter may be resolved by informal means at any time....
-
Sec. 469.102(b)
(b) The person shall submit the plans and specifications not later than the 20th day after the date the person issues the plans and specifications....
-
1. Public Participation and Request for Comments
The Access Board encourages all persons interested in the rulemaking to submit comments on the proposed standards and the questions in the preamble....
-
68.101(b) Lease Evaluation Form
(b) The agency shall, prior to advertisement for bid, submit to the department for a determination a completed Lease Evaluation Form obtained from the department....
-
Effect on the certification process of using more than one regulatory scheme at the state or local level to establish accessibility requirements for title III facilities with new design requirements in the proposed standards. (Section-by-Section Analysis)
regulatory scheme to incorporate its accessibility requirements for title III facilities, all of the requirements would be the subject of a request for certification, even if there are "joint" submitting...
-
Electronic Submission and Posting of Public Comments
You may submit electronic comments to http://www.regulations.gov. ...
-
Electronic Submission and Posting of Public Comments
You may submit electronic comments to http://www.regulations.gov....
-
Bike Lane Width
American Association of State Highway and Transportation Officials. Guide for the Development of Bicycle Facilities....
-
§ 37.147(b)
(b) Comments submitted by the state, if applicable;...
-
§8.24(d)(4)
(4) Indicate the official responsible for implementation of the plan; and...
-
§8.25(c)(4)
(4) Indicate the official responsible for implementation of the plan; and...
-
§8.21(c)(4)(iv)
(iv) Indicate the official responsible for implementation of the plan; and...
-
§35.150(d)(3)(iv)
(iv) Indicate the official responsible for implementation of the plan....
-
§ 35.150(d)(3)(iv)
(iv) Indicate the official responsible for implementation of the plan....
-
§ 37.141(b)
(b) To the maximum extent feasible, all elements of the coordinated plan shall be submitted on January 26, 1992....