(3) Modification of disapproved plan Not later than 90 days after the date of disapproval of a plan under this subsection, the public entity which submitted the plan shall modify the...
Search Results "Submitting Official"
-
12143(d)(3) Modification of disapproved plan
-
5. Comments on Proposed Rule
Most of the comments were submitted by disability advocacy organizations (17 comments) and individuals (16 comments)....
-
Sec. 469.102(d)
(d) A public official of a political subdivision who is legally authorized to issue building construction permits may not accept an application for a building construction permit for a building...
-
§8.56(h)(4)
(4) If neither party requests that the letter of findings be reviewed, the responsible civil rights official shall, within fourteen (14) calendar days of the expiration of the time period...
-
Re: 11B-904.3.4 Identification sign
In future, we invite you to submit a Helpdesk ticket, by using the "Feedback or Help", in dark blue next to the Search Bar!...
-
11B-606.6 Adjacent side wall or partition
However, some Local Building Officials or other Authorities Having Jurisdiction may apply it to both....
-
11B-606.6 Adjacent side wall or partition
However, some Local Building Officials or other Authorities Having Jurisdiction may apply it to both....
-
§27.11(a)(1)
(1) If the responsible Departmental official finds that a qualified person with a disability has been excluded from participation in, denied the benefits of, or otherwise subjected to discrimination...
-
6.3 Minority Reports
Access Board rules allowed individual Committee members to submit their views about this issue through a Minority Report....
-
16(i)
The report shall state the number of hotels by Brand (i) that submitted requests for extensions (and their disposition), surveys, plans, and certifications, (ii) whose surveys were verified...
-
§ 37.135(f)(2)
(2) The FTA Regional Office (as listed in appendix B to this part) for all other entities required to submit a paratransit plan....
-
III-9.2000 Relationship to State and local enforcement efforts
The enforcement of these codes is the responsibility of State or local officials....
-
1.2.3 Alternative materials, design and methods of construction and equipment
An alternative material, design or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the...
-
1.2.3 Alternative materials, design and methods of construction and equipment
An alternative material, design or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the...
-
§27.125(a) General.
If there is reasonable cause for the responsible Departmental official to believe that there is a failure to comply with any provision of this part that cannot be corrected by informal means...
-
Alterations to prison cells.
that are not an issue in other government buildings, so the Department must strike a balance between the accessibility needs of inmates with disabilities and the concerns of the prison officials...
-
382.9 What may foreign carriers do if they believe a provision of a foreign nation’s law prohibits compliance with a provision of this Part?
However, if a foreign government officially informs a carrier that it plans to take enforcement action (e.g., impose a civil penalty) against a carrier for failing to implement a provision...
-
§27.123(b) Complaints.
any specific class of individuals to be harmed by failure to comply with this part may, personally or through a representative, file a written complaint with the responsible Departmental official...
-
§8.56(j)(1) General
The responsible civil rights official may attempt to resolve a matter through informal means at any stage of processing. A matter may be resolved by informal means at any time....
-
The Commenters
Architectural and Transportation Barriers Compliance Board (ATBCB); the Building Officials Code Administrators International, Inc....
-
Sec. 469.102(b)
(b) The person shall submit the plans and specifications not later than the 20th day after the date the person issues the plans and specifications....
-
1. Public Participation and Request for Comments
The Access Board encourages all persons interested in the rulemaking to submit comments on the proposed standards and the questions in the preamble....
-
68.101(b) Lease Evaluation Form
(b) The agency shall, prior to advertisement for bid, submit to the department for a determination a completed Lease Evaluation Form obtained from the department....
-
§ 37.147(b)
(b) Comments submitted by the state, if applicable;...