Judgment" means a judgment entered by the District Court in the Willits Action, substantially in the form attached to this Settlement Agreement as Exhibit "D", that, among other things, fully approves...
Search Results "Approved"
-
L. Judgment
-
§100.60(b)(4)
qualification criteria or applications, or sale or rental standards or procedures, such as income standards, application requirements, application fees, credit analysis or sale or rental approval...
-
Attorney’s Fees and Costs
These fees must be paid within 30 days of District Court’s final approval of the Settlement Agreement and the award of attorney’s fees....
-
711.3.1.2 Through-penetration firestop system
Through penetrations shall be protected by an approved penetration firestop system installed as tested in accordance with ASTM E 814, with a minimum positive pressure differential of 0.01...
-
711.4.6 Floor fire doors
Floor fire doors shall be labeled by an approved agency....
-
1.1.9 Effective date of this code
Only those standards approved by the California Building Standards Commission that are effective at the time an application for building permit is submitted shall apply to the plans and...
-
§100.201a(a)
The incorporation by reference of these standards has been approved by the Director of the Federal Register....
-
1009.10 Directional signage
the other means of egress and which of those are accessible means of egress shall be provided at the following: At exits serving a required accessible space but not providing an approved...
-
Rough Grade Site Inspection
areas on the site. 11B-206.2.2 If site conditions have swamp type lands, steep grades, drainage ditches, flood hazards or other inconsistencies with the approved...
-
Rough Grade Site Inspection
areas on the site. 11B-206.2.2 If site conditions have swamp type lands, steep grades, drainage ditches, flood hazards or other inconsistencies with the approved...
-
How Much Money Do You Require Minimum to Start a Business in Dubai?
Industrial licenses, which cover manufacturing activities, tend to involve higher setup costs due to facility and approval requirements....
-
E. Paperwork Reduction Act
Under the Paperwork Reduction Act (PRA), federal agencies are generally prohibited from conducting or sponsoring a “collection of information: as defined by the PRA, absent OMB approval....
-
Sec. 469.053(a)
(a) The presiding officer of the commission, with the commission’s approval, shall appoint an advisory committee for the architectural barriers program....
-
702.7.1 ITU-T Recommendation E.161, Series E
international telephone service, Arrangement of digits, letters and symbols on telephones and other devices that can be used for gaining access to a telephone network, February 2001, IBR approved...
-
21. Attorneys’ Fees and Costs
The Parties agree that, conditioned upon the District Court granting Final Approval of this Settlement Agreement, the Judgment becoming Final, and the District Court granting Plaintiffs’...
-
702.7.2 ITU-T Recommendation G.722.2, Series G
Digital terminal equipment – Coding of analogue signals by methods other than PCM, Wideband coding of speech at around 16 kbit/s using Adaptive Multi-Rate Wideband (AMR-WB), July 2003, IBR approved...
-
§382.125(a)
(a) As a carrier, you must stow wheelchairs, other mobility aids, or other assistive devices in the baggage compartment if an approved stowage area is not available in the cabin or the items...
-
1007.10 Directional signage
indicating the location of the other means of egress and which are accessible means of egress shall be provided at the following: At serving a required space but not providing an approved...
-
E. Paperwork Reduction Act
Under the Paperwork Reduction Act (PRA), Federal agencies are generally prohibited from conducting or sponsoring a ‘‘collection of information’’ as defined by the PRA, absent OMB approval...
-
§100.120(b)(1)
or refusing to provide to any person information regarding the availability of loans or other financial assistance, application requirements, procedures or standards for the review and approval...
-
§ 35.150(d)(4)
(Approved by the Office of Management and Budget under control number 1190-0004)...
-
907.2.3 Group E
Auditoriums, cafeterias, gymnasiums and the like are protected by heat detectors or other approved detection devices. 2.3....
-
C. Statement of Procedures and Practices
The Department will review each submission and will promptly either approve it, or return it to State officials for revision....
-
1.9.1.4 Enforcing agency
For accessibility, in State-funded tenant improvements to State-leased facilities, the local jurisdiction must be aware of DGS’ jurisdictional authority and DSA’s jurisdictional approvals...