(g) The commission must submit all proposed changes to any rule or procedure that relates to the architectural barriers program to the committee for review and comment before adopting or...
Search Results "Baby Changing Station"
Commonly Searched Documents
-
Sec. 469.053(g)
-
d-vi
Does the ramp have a level landing that is at least 60 inches long at the top and bottom of each ramp section or where the ramp changes direction?...
-
Stability
The degree to which a surface resists change from contaminants or applied force, so that when the contaminant or force is removed, the surface returns to its original condition (U.S....
-
STRUCTURAL IMPRACTICABILITY
Changes having little likelihood of being accomplished without removing or altering a load-bearing structural member and/or incurring an increased cost of 50 percent or more of the value...
-
Question 5
YES/NO 5. Is the surface of the accessible route to the entrance smooth and free of large cracks and broken or raised areas?
-
Mats
Recommendation: ADAAG does not contain provisions for carpet that is not permanently fixed, such as matting placed in lobbies during inclement weather. Where used, it is recommended...
-
Visible Alarms
The 2010 Standards require increased access through the accessible common use circulation path requirement, but neither the 1991 Standards nor the 2010 Standards require employee work stations...
-
Re: Co-sharing of Accessible Parking access Aisles by adjacent elevator door allowed?
Changes in level are not permitted in access aisles. 2016 CBC 11B-247.1.2.5, 11B-502.4...
-
704.4.1 Height
Facilities that often provide seats at TTY's include, but are not limited to, airports and other passenger terminals or stations, courts, art galleries, and convention centers....
-
704.4.1 Height
Facilities that often provide seats at TTY's include, but are not limited to, airports and other passenger terminals or stations, courts, art galleries, and convention centers....
-
704.4.1 Height
Facilities that often provide seats at TTY's include, but are not limited to, airports and other passenger terminals or stations, courts, art galleries, and convention centers....
-
Executive Order 12866
evaluation is that there will be no significant cost impacts as the result of provisions of the final rule for commuter rail operators and modest costs at a relatively small number of stations...
-
Visual Alarms [4.28.3]
The technical requirements apply to single-station and building-wide alarm systems and are based in part on research sponsored by the Access Board as well as Underwriters Laboratories (UL...
-
810.5.3 Platform and Vehicle Floor Coordination--Modification to 810.5.3 of Appendix D to 36 CFR Part 1191
810.5.3 Platform and Vehicle Floor Coordination--Modification to 810.5.3 of Appendix D to 36 CFR Part 1191 Station platforms shall be positioned to coordinate with vehicles in accordance...
-
§382.10(f)(2)
(2) With respect to an application you make after September 10, 2008, you must comply with the provisions of this part without change from May 13, 2009 until the Department responds to your...
-
Agency (Preamble, Section-by-Section Analysis)
No substantive comments were received regarding this definition and no changes have been made in the final rule....
-
1132A.4.1, Item 2
Thresholds with a change in height between ¼ inch (6.35 mm) and ¾ inch (19.05 mm) shall be beveled with a slope no greater than 1 unit vertical in 2 units horizontal (50-percent slope)....
- Bobrick ClassicSeries Recessed Convertible Paper Towel Dispenser/Waste Receptacle B-3947
-
[F] 907.4.2.2 Height
[F] 907.4.2.2 Height. The height of the manual fire alarm boxes shall be a minimum of 42 inches (1067 mm) and a maximum of 48 inches (1219 mm) measured vertically, from the floor...
-
ACCESSIBLE ROUTE & PATH OF TRAVEL QUESTIONS:
[See subsections ...]
-
There does not seem to be a distinction between different EVCS standards (Level 1, Level 2, DC CHAdeMO, DC CCS, and Tesla). Does the schedule defined in Table 11B-228.3.2.1 make a distinction between the different types of EVSE standards or are that all considered to equivalently be an EVCS?
RESPONSE: The CBC Chapter 11B accessibility requirements for EVCS do not distinguish between the different EVCS standards like those listed. However, building officials may view...
-
907.2.7 Group M
A manual fire alarm system shall be installed in Group M occupancies having an occupant load of 500 or more persons or more than 100 persons above or below the lowest level of exit...
-
907.2.7.1 Occupant notification
During times that the building is occupied, in lieu of the automatic activation of alarm notification appliances, the manual fire alarm system shall be allowed to activate an alarm...
-
Requirements to Remember for: Commuter Rail Projects
[See subsections ...]