A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
Search Results "Sloped Entry"
-
1007.3.1 Start of Play
-
RV Parking Spaces Within Camping Units With Mobility Features and RV Pull-Up Spaces at Dump Stations [F244.2.3.2.1 and F244.4]
RV parking spaces within camping units with mobility features and RV pull-up spaces at dump stations must comply with the technical requirements for width, surface, and slope of RV spaces...
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
A4.8.4 Landings
Level landings are essential toward maintaining an aggregate slope that complies with these guidelines....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
1007.3.1 Start of Play
A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
1010.1 Turning Space
A circular turning space 60 inches (1525 mm) diameter minimum with slopes not steeper than 1:48 shall be provided at shooting facilities with firing positions. ...
-
4. Organization of Technical Criteria
Mammography equipment that is designed for use by patients seated in a wheelchair would have to meet the technical criteria for wheelchair spaces, changes in level at entry to the wheelchair...
-
1016.8 Resting Intervals
This section contains the technical requirements for the length (1016.8.1), width (1016.8.2), and slope (1016.8.3) of resting intervals; and for a turning space (1016.8.4) where resting...
-
Raised Crossings
Consult local Standards for application requirements, including slope for vehicle traffic, height, and markings....
-
809.5.5.2 Identification
A means for visually identifying a visitor without opening the residential dwelling unit entry door shall be provided and shall allow for a minimum 180 degree range of view....
-
§ 37.42(a)
(a) In addition to meeting the requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry...
-
11B-208.3.3.2
An accessible route from the residential dwelling unit's primary entry door to the vehicular entrance at the garage....
-
§ 37.42(a)
(a) In addition to meeting the requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry...
-
1132A.5.2 Strike edge maneuvering space at doors
The width of the level area at the exterior side of the primary entry door and any required exit doors shall comply with Section 1126A. Notes: 1....
-
§ 38.95(a)(1) General
All new commuter rail cars, other than level entry cars, covered by this subpart shall provide a level-change mechanism or boarding device (e.g., lift, ramp or bridge plate) complying with...
-
809.5.5.2 Identification
A means for visually identifying a visitor without opening the residential dwelling unit entry door shall be provided and shall allow for a minimum 180 degree range of view....
-
608.2.1 Transfer Type Shower Compartments
shower compartments shall be 36 inches (915 mm) by 36 inches (915 mm) clear inside dimensions measured at the center points of opposing sides and shall have a 36 inch (915 mm) wide minimum entry...
-
804.2.1 Pass Through Kitchen
Pass through kitchens shall have two entries. Figure 804.2.1 Pass Through Kitchens...
-
Using the Beach Access Route Exceptions [1018.1, Exceptions 1 and 2]
Removable Beach Access Route Requirements Removable beach access routes are not required to comply with the specific requirements for running slope, cross slope, resting intervals, and...
-
R105 Definitions (Section-by-Section Analysis)
The proposed guidelines define the following terms: accessible, alteration, blended transition, cross slope, curb line, curb ramp, element, facility, grade break, operable part, pedestrian...
-
Grade (R302.5) (Section-by-Section Analysis)
Grade (R302.5) (Section-by-Section Analysis) Grade is the slope parallel to the direction of pedestrian travel....
-
T402.8.1 Deployment to Roadways or to Curb Height Boarding and Alighting Areas
The running slope of ramps and bridgeplates used for deployment to the roadway or to curb-height boarding and alighting areas shall be 1:6 maximum, as measured to ground level with the non-rail...