Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
Search Results "Pedestrian Traffic Control Button"
Commonly Searched Documents
-
11B-604.5.2 Rear wall
-
11B-604.5.2 Rear wall
Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
-
11B-604.5.2 Rear wall
Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
-
FIRST CAUSE OF ACTION
Pedestrian rights of way themselves constitute a vital public program, service, or activity under Title II of the ADA. 28 C.F.R. § 35.104; Barden v....
-
Adding longer descriptions with a button
Another way to provide long descriptions is to use a button or other element that displays/hides the alternative text as shown below: Main chart image: Alt = “” Button image: Alt...
- Wagner Instruments Force Ten ™ FDX
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
11B-250 Circulation paths
[See subsections ...]
-
T704 Announcement Systems
[See subsections ...]
-
§27.71(k)(3)(ii) Timing.
(ii) Timing. Where a timed response is required, the user must be alerted visually and by touch or sound and must be given the opportunity to indicate that more time is required;
-
§ 27.71(k)(3)(ii) Timing
(ii) Timing. Where a timed response is required, the user must be alerted visually and by touch or sound and must be given the opportunity to indicate that more time is required;
-
T704 Announcement Systems
The technical requirements for announcement systems include provisions on automated route identification announcement systems, automated stop announcement systems, and stop request...
-
11B-812.10.2 Operable parts
Operable parts and charging cord storage shall comply with Section 11B-309.
-
11B-812.10.2 Operable parts
Operable parts and charging cord storage shall comply with Section 11B-309.
-
11B-804.6.5.3 Controls
Ovens shall have controls on front panels....
- Murdock Manufacturing High-Efficiency Washout Urinal
- Mansfield Cascade Commercial Package Urinal and Flush Valve CP-410
- BEA Inc. Jamb Style Door Access PTE (Push To Exit)
- Neo-Metro Commercial Contour Urinal 8944 Series