A level landing, 48” deep and at least as wide as the curb ramp, is required at the top of a curb ramp....
Search Results "Grade Level Exit"
Commonly Searched Documents
-
11B-406.5.3 Landings
-
Vertical Clearance [4.6.5]
In garages, at least one vehicular route connecting van spaces to entrances and exits must provide this clearance; van spaces can be clustered on one level....
-
Accessible Means of Egress
A continuous and unobstructed way of egress travel from any point in a building or facility that provides an accessible route to an area of refuge, a horizontal exit, or a public way....
-
Transfer Platforms
or landing that an individual who uses a wheelchair or mobility device can use to lift or transfer onto the play structure and leave the wheelchair or mobility device behind at ground level...
- BYO Recreation Inc. Fun Hoop
-
4. Comparison of Proposed Technical Provisions Applicable to Shared Use Paths and AASHTO Guide
The maximum grade of a shared use path adjacent to a roadway should be 5 percent, but the grade should generally match the grade of the adjacent roadway....
-
1009.6.1 Travel distance
The maximum travel distance from any accessible space to an area of refuge shall not exceed the exit access travel distance permitted for the occupancy in accordance with Section 1017.1....
-
11B-238.2.3 Weather shelters
Where provided, weather shelters shall be designed and constructed so that a golf car can enter and exit the weather shelter and shall comply with Section 11B-1006.4....
-
DRIVE AISLE
A vehicular way provided within a parking facility that connects vehicular entrances, parking stalls, electric vehicle charging stations, passenger loading zones, and vehicular exits....
- Listen Technologies iDSP Prime Level III Stationary RF System Personal Listening Product
-
R305.2.1 Perpendicular Curb Ramps
Where the ends of the bottom grade break are behind the back of curb and the distance from either end of the bottom grade brake to the back of curb is 1.5 m (5.0 ft) or less, detectable...
- CaviLock CL100 LaviLock
-
11B-233.3.1.2.6.2 Test number one, individual building test
The slopes of the planned finished grade measured between the entrance and all vehicular or pedestrian arrival points within 50 feet (15,240 mm) of the planned entrance also exceed 15 percent...
-
TEST NO. 3 – UNUSUAL CHARACTERISTICS TEST
high-hazard areas and sites subject to other similar requirements of law or code that require the lowest floor or the lowest structural member of the lowest floor to be designed to a specified level...
-
TEST NO. 3 – UNUSUAL CHARACTERISTICS TEST
high-hazard areas and sites subject to other similar requirements of law or code that require the lowest floor or the lowest structural member of the lowest floor to be designed to a specified level...
-
R305.1.4 Size
At pedestrian at-grade rail crossings not located within a street or highway, detectable warnings shall extend the full width of the crossing....
-
Surfaces (R302.7) (Section-by-Section Analysis)
Grade breaks (i.e., the line where two surface planes with different grades meet, see R105.5) must be flush....
-
Test Courses & Surfaces
This “access route” was 574.2 ft (175.0 m) in length, and included two 137 ft (41.8 m) sections with grades of 4% to 5% (one uphill, one downhill), and two 30-foot (9.1 m) ramps with grades...
-
Chapter 6 BUILDING AN EVACUATION PLAN FOR A PERSON WITH A COGNITIVE DISABILITY
These disabilities are caused by a wide range of conditions, but all result in some decreased level of ability to process or understand information or situations....
-
III-7.5115 Elevators and platform lifts
Elevators are required to serve each level in a newly constructed building, with four exceptions: 1) Exception 1 is the "elevator exemption" discussed above (see III−5.4000). 2) Exception...
-
QUESTION: IF A PLATFORM IS OWNED BY A PRIVATE ENTITY OTHER THAN THE PASSENGER RAILROAD, WHAT HAPPENS IF THE PRIVATE ENTITY OBJECTS TO THE CREATION OF A LEVEL BOARDING PLATFORM?
passing through the station and adjacent to the platform is shared with existing freight rail operations, the passenger railroad must comply with the performance standard by providing level-entry...
-
“Accessible Trail” is a term to avoid
The technical provisions in section 7.4 of the FSTAG allow for grades up to 12 percent....
-
ADA and Level Boarding - Q&A on Wheelchairs and Bus and Rail Service
DEPARTMENT OF TRANSPORTATION DISABILITY LAW GUIDANCE
-
1133B.2.4.2
SECTION 1133B GENERAL ACCESSIBILITY FOR ENTRANCES, EXITS AND PATHS OF TRAVEL 1133B.2 Doors. 1133B.2.4 Floor level at doors. ...