Interior or exterior circulation paths, rooms, spaces, or elements that are not for public use and are made available for the shared use of two or more people....
Search Results "Element-by-Element"
Commonly Searched Documents
-
Common Use
-
4.3.10* Egress
Accessible routes serving any accessible space or element shall also serve as a means of egress for emergencies or connect to an accessible area of rescue assistance....
-
§100.201 Premises
Premises means the interior or exterior spaces, parts, components or elements of a building, including individual dwelling units and the public and common use areas of a building....
-
609.5 Surface Hazards
Grab bars and any wall or other surfaces adjacent to grab bars shall be free of sharp or abrasive elements and shall have rounded edges....
-
F244.5.1 Routes Within Camping Units with Mobility Features
At least one outdoor recreation access route shall connect accessible elements, spaces, and facilities provided within camping units with mobility features....
-
Trail
A pedestrian route developed primarily to connect elements, spaces, or facilities within a site is not a trail....
-
F245.4.1 Routes Within Picnic Units with Mobility Features
At least one outdoor recreation access route shall connect accessible elements, spaces, and facilities provided within picnic units with mobility features....
-
11B-609.5 Surface hazards
Grab bars and any wall or other surfaces adjacent to grab bars shall be free of sharp or abrasive elements and shall have rounded edges....
-
11B-707.4 Privacy
ETA Editor's Note The Department of Justice considers the communication-related elements of ATMs to be auxiliary aids and services, rather than structural elements, to which the Safe...
-
Section 4.1.6, Alterations (Preamble, Section-by-Section Analysis)
First, if any existing element or space is altered, the altered element or space must meet new construction requirements (section 4.1.6(1)(b))....
-
1. Accessible route(s)
Accessible element or space ANSI A117.1 section APPLICATION 1....
-
11B-707.4 Privacy
ETA Editor's Note The Department of Justice considers the communication-related elements of ATMs to be auxiliary aids and services, rather than structural elements, to which the Safe...
-
11B-707.4 Privacy
. ◼ ETA Editor's Note The Department of Justice considers the communication-related elements of ATMs to be auxiliary aids and services, rather than structural elements, to which the...
-
Introduction
The scoping requirements specify when and where elements must be accessible....
-
Common Use
Interior or exterior circulation paths, rooms, spaces, or elements that are not for public use and are made available for the shared use of two or more people. [ECTCR UFAS 3.5]...
-
306.3.2 Maximum Depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (230 mm) above the finish floor or ground....
-
306.3.2 Maximum Depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (230 mm) above the finish floor or ground....
-
9. Platform lift
Accessible element or space ANSI A117.1 section APPLICATION 9....
-
Public Use
Interior or exterior rooms, spaces, or elements that are made available to the public. Public use may be provided at a building or facility that is privately or publicly owned....
-
11B-306.3.2 Maximum depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (229 mm) above the finish floor or ground....
-
202.3.2 Extent of Application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction....
-
306.3.2 Maximum Depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (230 mm) above the finish floor or ground....
-
4.30.7(1)
(1) Facilities and elements required to be identified as accessible by 4.1 shall use the international symbol of accessibility....
-
306.3.2 Maximum Depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (230 mm) above the finish floor or ground....