Elevators are required in "multi-story" facilities....
Search Results "Elevator Hall Signal"
Commonly Searched Documents
-
Scoping [4.1.3(5)]
-
1150A.1 General
Covered multifamily dwellings in buildings without an elevator, located on sites with difficult terrain conditions or unusual characteristics, may employ the site impracticality tests in...
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
Section 36.401 New Construction (Preamble, Section-by-Section Analysis)
Section 36.401 New Construction General Section 36.401 implements the new construction requirements of the ADA. Section 303 (a)(1) of the Act provides that discrimination for...
-
Sec.36.404(a)(1)
(1) For the purposes of this section, "professional office of a health care provider'' means a location where a person or entity regulated by a State to provide professional services...
-
§ 35.151(c)(2)
(2) Facilities on which construction commences on or after [date six months after the effective date of the final rule], shall comply with the proposed standards.
-
e-v
e-v. Are raised letters and Braille characters used to identify each floor button and each control? [ADA Standards § 4.10.12] Yes No
-
§ 36.401 New construction.
[See subsections ...]
-
Sec.36.401 New construction
Sec.36.401 New construction.
-
§ 36.404(a)(1)
(1) For the purposes of this section, "professional office of a health care provider" means a location where a person or entity regulated by a State to provide professional services...
-
A4.10.6 Door Protective and Reopening Device
The required door reopening device would hold the door open for 20 seconds if the doorway remains obstructed. After 20 seconds, the door may begin to close. However, if designed in...
-
4.1.6(3)(c)(ii)
(ii) Where existing shaft configuration or technical infeasibility prohibits strict compliance with 4.10.9, the minimum car plan dimensions may be reduced by the minimum amount...
-
A4.10.6 DOOR PROTECTIVE AND REOPENING DEVICE
The required door reopening device would hold the door open for 20 seconds if the doorway remains unobstructed. After 20 seconds, the door may begin to close. However, if designed in...
-
III-5.0000 NEW CONSTRUCTION
[See subsections ...]
-
Section 36.401 New Construction (Section-By-Section Analysis and Response to Comments)
Section 36.401 New Construction (Section-By-Section Analysis and Response to Comments) General Section 36.401 implements the new construction requirements of the ADA. Section...
-
4.1.6(1)(b)
structural changes are planned or installed where none existed previously, then a means of accessible vertical access shall be provided that complies with 4.7, Curb Ramps; 4.8, Ramps; 4.10, Elevators...
-
§8.26 Distribution of accessible dwelling units.
This provision shall not be construed to require provision of an elevator in any multifamily housing project solely for the purpose of permitting location of accessible units above or below...
-
10.3.1(1)
(1) Elements such as ramps, elevators or other circulation devices, fare vending or other ticketing areas, and fare collection areas shall be placed to minimize the distance which wheelchair...
-
407.2.3.1 Floor Designation
Floor designations complying with 703.2 and 703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
Clear Floor or Ground Space
The clear floor space is permitted to overlap onto the landing area to provide access to this elevated window activity....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
11.1 Q. Under the individual building test, how is the second step of the test performed, which involves measuring the slope of the finished grade between the entrance and applicable arrival points?
A. The slope is measured at ground level from the entrance to the top of the pavement of all vehicular and pedestrian arrival points within 50 feet of the planned entrance, or, if...
-
1(2)(a) Site impracticality due to terrain
(a) Site impracticality due to terrain. There are two alternative tests for determining site impracticality due to terrain: the individual building test provided in paragraph (i), or...