Compliance is required where stairs are the only connection between two levels, such as between floors in buildings without elevators....
Search Results "CBC: California Building Code"
Commonly Searched Documents
-
Scoping [4.1.3(4)]
-
1003.2.12.2 Opening limitations
Source: Sections 1003.2.12.1 and 1003.2.12.2, International Building Code. Reprinted with permission of the International Code Council, Falls Church, Virginia....
- Lift-Uยฎ LU12 Step/Platform Onboard Lift
-
11B-206.4 Entrances
Where an alteration includes alterations to an entrance, and the building or facility has another entrance complying with 404 that is on an accessible route, the altered entrance shall not...
-
11B-206.4 Entrances
Where an alteration includes alterations to an entrance, and the building or facility has another entrance complying with 404 that is on an accessible route, the altered entrance shall not...
-
11B-206.4 Entrances
Where an alteration includes alterations to an entrance, and the building or facility has another entrance complying with 404 that is on an accessible route, the altered entrance shall not...
-
11B-215 Fire alarm systems and carbon monoxide alarm systems
[2010 ADA Standards] 215 Fire Alarm Systems ETA Editorโs Note The CBC includes carbon monoxide alarm systems. Therefore, the CBC is more inclusive....
-
11B-220 Automatic teller machines, fare machines and point-of-sale devices
[2010 ADA Standards] 220 Automatic Teller Machines and Fare Machines ETA Editorโs Note The CBC includes point-of-sale devices. Therefore, the CBC is more inclusive....
-
802.1.5 Overlap
The term "circulation paths" used in 802.1.5 means aisle width required by applicable building or life safety codes for the specific assembly occupancy....
-
TECHNICALLY INFEASIBLE
[DSA-AC] An alteration of a building or a facility, that has little likelihood of being accomplished because the existing structural conditions require the removal or alteration of a load-bearing...
-
Door Swing: ADA Standard Section 603.2.3
Section 603.2.3 covers the current ADA Standards for door swings at clear floor space and clearances at fixtures in toilet and bathing rooms.
-
11B-809.4.1 Subsequent bathrooms
ETA Editor's Note The requirement for an accessible shower at subsequent bathrooms prescribed by CBC 11B-809.4.1 is not required by 2010 ADA Standards....
- Braille Authority of North America (BANA)
-
11B-805 Medical care and long-term care facilities
ETA Editor's Note The numbering of subsections within Section 11B-805 is not aligned between CBC and 2010 ADAS....
-
Which Paths Are Usable Circulation Paths?
Building management should consider installing appropriate visual, tactile, and/or braille signage in appropriate locations conforming to the code requirements in Annex C....
-
Deferred Maintenance
Maintenance work includes improving accessibility as well as compliance with building codes....
- Seating Solutions ADA Platforms, Ramps & Stairs
-
11B-805 Medical care and long-term care facilities
ETA Editor's Note The numbering of subsections within Section 11B-805 is not aligned between CBC and 2010 ADA Standards....
-
11B-802.1.5 Overlap
The term "circulation paths" used in 802.1.5 means aisle width required by applicable building or life safety codes for the specific assembly occupancy....
-
802.1.5 Overlap
The term "circulation paths" used in 802.1.5 means aisle width required by applicable building or life safety codes for the specific assembly occupancy....
-
802.1.5 Overlap
The term "circulation paths" used in Section 802.1.5 means aisle width required by applicable building or life safety codes for the specific assembly occupancy....
-
Exits
Exits Scoping for entrances is based in part on the number of exits required by the applicable building or life safety code....
-
11B-802.1.5 Overlap
The term "circulation paths" used in 802.1.5 means aisle width required by applicable building or life safety codes for the specific assembly occupancy....
-
ยง 37.9(c)(1)
(1) New construction or alterations of buildings or facilities on which construction has begun, or all approvals for final design have been received, before November 29, 2006, are not required...