The clear width of a ramp run shall be 48 inches (1219 mm) minimum....
Search Results "Aisle Ramp"
Commonly Searched Documents
-
11B-405.5 Clear width
-
11B-405.5 Clear width
The clear width of a ramp run shall be 48 inches (1219 mm) minimum. Exceptions: 1.Ā Ā Ā Ā Ā ...
-
11B-240.2.1.2 Additional number and types
Exception: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
F240.2.1.2 Additional Number and Types
EXCEPTION: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
240.2.1.2 Additional Number and Types
EXCEPTION: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
240.2.1.2 Additional Number and Types
EXCEPTION: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
11B-240.2.1.2 Additional number and types
Exception: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
11B-240.2.1.2 Additional number and types
Exception: If at least 50 percent of the elevated play components are connected by a ramp and at least 3 of the elevated play components connected by the ramp are different types of play...
-
11B-812.10.4 Location
For alterations at existing facilities where an accessible route or general circulation path is not provided adjacent to the head end of the vehicle space or access aisle, the EV charger...
-
Q12: Full-depth Pavement Patching
pavement, even including a portion of the crosswalk, patching the pavement would typically be considered maintenance and would not require simultaneous installation or upgrading of curb ramps...
- EZ Dock EZ TRAILĀ® Modular Walkway
-
TERMS OF SETTLEMENT
operable working condition on Election Day those features of facilities and equipment (including permanent equipment such as lifts and elevators, and temporary equipment such as portable ramps...
-
Accessible Routes
Accessible boat slips, accessible boarding piers at boat launch ramps,and other accessible spaces and elements within a boating facility must also be connected by an accessible route....
-
T503.1 General
Illumination shall be provided at ramps, bridgeplates, doorways, and boarding and alighting areas in accordance with T503....
-
11B-812.10.4 Location
For alterations at existing facilities where an accessible route or general circulation path is not provided adjacent to the head end of the vehicle space or access aisle, the EV charger...
-
M303.3.3.1 Running Slope
Ramp runs shall have a running slope not steeper than 1:12....
-
Jeanne Halloin, IES. Existing Standards and Design Guidance
Entrances (slides 3 and 4) Additional comments: Need better signage at entrances Handle locations should be consistent Ramps (slide 5) Route of Travel...
-
4.1.7(1)(a)
(a) As a general rule, the accessibility provisions of part 4 shall be applied to "qualified" historic buildings and facilities. "Qualified" buildings or facilities are those...
-
Designing Sidewalks and Trails for Access, Part II of II: Best Practices Design Guide
This guidebook is the second part of a two-phase project focused on designing sidewalks and trails for access. It was created to provide planners, designers, and transportation...
-
Designing Sidewalks and Trails for Access, Part I of II: Review of Existing Guidelines and Practices
Sidewalks and trails serve as critical links in the transportation network by providing pedestrian access to commercial districts, schools, businesses, government offices, and...
- seca 664 - electronic wheelchair scale_without comments - seca1840
-
Accessible - Changes in Level
Changes in level greater than 1/2" shall be accomplished by means of a ramp. The maximum slope of a ramp in new construction shall be no greater than 1;12....
-
11B-204.1 General
Protruding objects on circulation paths shall comply with Section 11B-307. Exceptions: Within areas of sport activity, protruding objects on circulation paths shall not be...