., mechanical engineer for mechanical-only projects; electrical engineer for electrical-only projects), licensed to practice in California, who is responsible for the completion of the project...
Search Results "Project"
Commonly Searched Documents
-
4. DEFINITION:
-
11B-502.6.3 Location
Signs shall be permanently posted either immediately adjacent to the parking space or within the projected parking space width at the head end of the parking space....
-
1.9.1.4.1
1.9.1.4.1 The director of the Department of General Services where state funds are utilized for any project or where funds of counties, municipalities or other political subdivisions are...
-
1.9.1.4.1
1.9.1.4.1 The director of the Department of General Services where state funds are utilized for any project or where funds of counties, municipalities or other political subdivisions are...
-
1.9.1.4.1
1.9.1.4.1 The director of the Department of General Services where state funds are utilized for any project or where funds of counties, municipalities or other political subdivisions are...
-
11B-404.2.4.3 Recessed doors and gates
approach shall be provided when any obstruction within 18 inches (457 mm) of the latch side at an interior doorway, or within 24 inches (610 mm) of the latch side of an exterior doorway, projects...
-
3. REQUIREMENT TO COMPLY:
Projects not requiring DSA approval (i.e., exempt projects) shall comply with all currently effective design, construction, and inspection provisions of the California Code of Regulations...
-
2. DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATMENT
DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATEMENT: The drawing sheet delineating the Path of Travel (POT) for a project shall include the following statement: "Design Professional...
-
11B-406.5.1 Location
Curb ramps and the flared sides of curb ramps shall be located so that they do not project into vehicular traffic lanes, parking spaces, or parking access aisles....
-
2.2 Path of Travel Exterior Elements
2.2 Path of Travel Exterior Elements: In addition to the five specific items listed above, the path of travel also includes an exterior approach to the project area....
-
1.5 Accessible Route Requirements for Campus Settings
The following factors may apply to projects on existing campus facilities: • New construction on an existing site must be connected, as part of the basic project scope, with an accessible...
-
3.1.1. Total Number of U.S Auditoriums (2015)
Digital Projection System Analog Projection System Total Indoor 38,688 650 39,338...
-
11B-202 Existing buildings and facilities
INTERPRETATION The phrase "projects consisting only of " shall be understood to allow work that is incidental to projects covered under Section 11B-202.4, Exception 7....
-
68.10(23) Registered Building or Facility
(23) Registered Building or Facility--For the purposes of § 469.101 of the Act, a registered building or facility is a construction project that has been assigned a project registration...
-
Organization and Prioritization
Develop color-code system for files, projects, or activities Use weekly chart to identify daily work activities Use the services of a professional organizer Use a job coach to teach...
-
§8.22(a)
(a) New multifamily housing projects (including public housing and Indian housing projects as required by §8.25) shall be designed and constructed to be readily accessible to and usable...
-
3.3 Finding of Unreasonable Hardship:
Hardship: A finding of unreasonable hardship is appropriate only when the cost of full compliance is significantly above the 20-percent disproportionate cost limitation and would make the project...
-
7.1 Q. Do the new construction requirements of the Fair Housing Act apply to continuing care facilities which incorporate housing, health care and other types of services?
Factors that the Department will consider in making such an examination include, but are not limited to: 1. the length of time persons stay in the project; 2. whether policies are...
-
BACKGROUND
BACKGROUND: A project at an existing site is an alteration of that facility and subject to the requirements of CBC Section 11B-202.4 Path of travel requirements in alterations, additions...
-
First Occupancy
"First occupancy" is determined on a building-by-building basis, not on a project-by-project basis....
-
Clearance: ADA Standard Section 804.2
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
§8.27(a)(1)
(1) First, to a current occupant of another unit of the same project, or comparable projects under common control, having handicaps requiring the accessibility features of the vacant unit...
-
3. FIELD VERIFICATION
FIELD VERIFICATION: DSA may review the code compliance of the path of travel during the course of a project. 3.1 Plan Review: DSA may verify compliance of path of travel elements presented...
-
Beach Nourishment [F248.1.2]
Beach access routes are required when the entity that administers or manages the beach undertakes a beach nourishment project....