Side guard protocol: From initial setup, two side guards adjusted 6” (15.2 cm) higher than the subject’s WMD seat were attached, and subjects were asked to perform a level height transfer...
Search Results "Adjusted Construction Cost"
Commonly Searched Documents
-
Side guard protocol
-
ACTIONS TAKEN BY CITY OF WAUKEGAN
Since the early 1980s, all City street-level sidewalks have been constructed accessible with curb ramps. ...
-
VII. DISPUTE RESOLUTION
The parties hereto agree that any dispute or controversy arising out of, relating to, or in connection with this Agreement, or the interpretation, validity, construction, performance, breach...
- Oasis Barrier-Free Universal Split-Level VersaCooler II P8ACSL
- KMIR 6 News Story: Jack Nicklaus Fund Raiser for Wounded Veterans, featuring SoloRider golf carts
-
11B-224.1.3 Range of accommodations
Accessible guest rooms or suites shall be dispersed among the various classes of sleeping accommodations to provide a range of options applicable to room sizes, costs, and amenities provided...
-
13.1 Q. Are the public and common use areas of a newly constructed development that consists entirely of buildings having four or more multistory townhouses, with no elevators, required to be accessible?
The Fair Housing Act applies only to new construction of covered multifamily dwellings....
-
Operable Part
A component of ICT used to activate, deactivate, or adjust the ICT....
-
Operable Part
A component of ICT used to activate, deactivate, or adjust the ICT....
- Palmer Fixture HD0955-09 Stainless Steel Cover, Semi-Recessed Hand Dryer
-
502.4 Platform Accessibility Features (Section-by-Section Analysis)
addresses specifications for capabilities that users with disabilities have come to expect as core accessibility features when using today’s platforms and operating systems, such as allowing adjustment...
- Roadtech Manufacturing Retractable Cone Bar Barricades and Barriers
-
Operable Part
Hardware-based user controls for activating, deactivating, or adjusting ICT....
-
Operable Part
Hardware-based user controls for activating, deactivating, or adjusting ICT....
-
2.4.1 Current Marketplace Dynamics
Increasingly, these so-called “box tables” are being replaced by examination tables that are height adjustable, such as that shown in Figure 2.4.1(a)....
-
68.80. Fees
Plan review and inspection fees collected by the department shall be determined by the estimated cost of construction for the project, not including site acquisition, architectural, engineering...
- Behavioral Safety Products #SF380 Ligature Resistant Metering Faucet
-
Operable Parts
Components of diagnostic equipment that are used by the patient to activate, deactivate, or adjust the equipment....
-
Operable Parts
A component of diagnostic equipment that is used by the patient to activate, deactivate, or adjust the equipment....
-
a) History and Objectives
The draft transition plan identified the "essential services" offered by various city departments, including Library and RecPark, and estimated costs and timelines for removing the identified...
-
Section 4.1.6, Alterations (Preamble, Section-by-Section Analysis)
First, if any existing element or space is altered, the altered element or space must meet new construction requirements (section 4.1.6(1)(b))....
-
106.5.40 Operable Part
A component of an element used to insert or withdraw objects, or to activate, deactivate, or adjust the element....
-
Operable Part
A component of an element used to insert or withdraw objects, or to activate, deactivate, or adjust the element....